A standing seam clamp torque belongs with its test result. One clamp, its tested arrangement and the installation torque must stay together: SR-CKZ was tested by SGS, report XMIN2511003489ML01_EN, 2025, recording 2.71 kN maximum force. The setup photograph marks 15 N·m. That record is not a universal site torque or design capacity.
Read the result and the setup together
SGS report XMIN2511003489ML01_EN is dated 9 December 2025. Its first page identifies SR-CKZ, lists the sample name as Kalzip clamp and gives the product specification as 50 mm. The manufacturer field names Solaracks. The material field states aluminium 6005-T5, with a qualification that the sample information was supplied and confirmed by the client. The report does not independently verify that information. [1, p. 1]
Page 2 describes a pull test conducted to the client's requirements. The sample was fixed to the test machine, loaded at 5 mm/min until destruction and the maximum force determined. Its result table records 2.71 kN. Page 3 contains the specimen and test photographs; the before-loading photograph carries the 15 N·m torque annotation. Keep all three pages together when reviewing or forwarding the result. [1, pp. 2 to 3]
Several details are not expressly stated: a sample count, roof-sheet thickness, a named installed roof profile, a classified failure mode and a project allowable resistance. A photograph can help identify the arrangement, but it cannot fill those documentary gaps. Nor does the single result line establish how many specimens were tested. Request clarification where the project assessment needs it.
Kalzip is used here only to describe the sample name printed in the report. It does not imply endorsement, authorization or joint testing by the roof-system owner. The SR-CKZ product page helps identify the component; the report remains the source for the test result.
Keep standing seam clamp torque in the evidence chain
The torque annotation is part of this reported test arrangement. Removing it from a sales summary removes information the engineer needs to compare the tested connection with the proposed one. The useful statement includes the model, report number, maximum force and stated setup condition, rather than just a prominent kN figure.
The report does not show a series of tests at different torques. It therefore does not tell the buyer how the maximum force changes if the torque is lower or higher. It does not establish a percentage reduction, a correction curve or a torque range. This article makes none of those conversions.
Installation torque is also not a substitute for confirming the roof interface. A matching torque label cannot establish that another seam geometry, sheet thickness, fastener arrangement or clamp revision reproduces the tested assembly. Start with the background discussion of clamp capacity and roof profile, then request the evidence for the actual configuration being purchased.
For an EPC, the question is practical: which document connects the proposed roof, clamp and installation instructions to the value used in the calculation? If that connection is missing, record the question for the responsible engineer rather than assuming that the catalogue number supplies the answer.
Three SGS results are three separate records

These reports concern different identified components and arrangements. They are presented for traceability, not as a league table of interchangeable clamps. A larger reported maximum force does not, on its own, identify the appropriate product for a particular roof.
| Model | Report and year | Product specification printed on page 1 | Maximum force on page 2 | Installation torque stated in the report |
|---|---|---|---|---|
| SR-CKZ | XMIN2511003489ML01_EN, 2025 | 50 mm | 2.71 kN | 15 N·m in the page 3 setup photograph |
| SR-C406Y | XMIN2403000515ML02_EN, 2024 | 100 mm | 2,933 N | Not stated |
| SR-C700Y | XMIN2403000515ML03_EN, 2024 | 100 mm | 10.21 kN | Not stated |
SR-C406Y was tested by SGS, report XMIN2403000515ML02_EN, 2024; SR-C700Y was tested by SGS, report XMIN2403000515ML03_EN, 2024. Both describe loading at 5 mm/min until destruction under the client's requirements. Neither expressly states the installation torque or sample count. Do not copy the CKZ torque into their empty fields. [2, 3, pp. 1 to 3]
Keep the units as printed when quoting each report, or make any conversion explicit. The figures are maximum-force results, not allowable loads for a building. The responsible engineer must determine whether the evidence supports the proposed application and what assessment basis is required. Selecting a reduction factor without that assessment does not resolve a missing configuration match.
Obtain the issued instructions before specifying site torque
Use the current instructions issued for the exact system, clamp and fasteners on the project. Ask the supplier to identify the document title, revision, date and relevant page. Check that the hardware revision and roof interface in those instructions match the order and the engineer's design package.
This article does not prescribe a CKZ site torque, tightening sequence, retightening procedure or inspection interval. An applicable, current CKZ installation manual has not been established for this article. The 15 N·m annotation in the SGS photograph must therefore remain a test-condition statement, not an instruction for installers.
Where instructions are missing or conflict with the project specification, obtain written clarification before establishing the installation acceptance criteria. A torque setting taken from another clamp's manual does not close that gap. Neither does a photograph of a wrench beside a finished connection.
Ask the engineer and supplier to define what the site record needs to demonstrate, including any specified tool, checking method, acceptance criteria and response to a discrepancy. The resulting instructions should be traceable to the actual system. This approach keeps the article useful to procurement and QA without inventing a field procedure from a laboratory photograph.
Separate the clamp test from the roof assessment

The CKZ report records its pull-test result; it does not provide an assessment of the complete roof-to-building load path. Ask the project team how roof-sheet supports, clips, fixings and supporting structure are addressed. Do not treat a clamp maximum-force result as evidence that every downstream connection has been checked.
The report also does not state an assessment of long-term thermal movement, coating condition at the interface, fatigue or long-term loosening. These are questions for the relevant system and roof documentation, and for the project assessment. They should not be presented as properties demonstrated by this short pull test.
Likewise, the report does not establish compatibility with other roof profiles or make a roof-warranty determination. The buyer should obtain the roof manufacturer's applicable requirements and resolve interface questions with the responsible project parties. No general promise of no damage or preserved roof warranty follows from the reported force.
Keep these questions separate in the purchasing file. A documented answer about one issue does not silently answer the others. For the wider document check, use the guide to verifying a solar racking test report.
Build a handover record that can be followed later

The following is a proposed record structure for the project team to adapt. It is not a prescribed inspection method or sampling plan. Record only checks actually performed under the issued instructions; a blank or unresolved field must not be turned into a passing result.
| Record field | Information to retain |
|---|---|
| Connection identity | Clamp model and revision, fastener specification and relevant batch or delivery reference |
| Roof interface | Roof-sheet identification, profile drawing and thickness information used in the assessment |
| Instruction basis | Installation document title, revision, date, page and project-specific clarification |
| Tool record | Tool identifier and the calibration information required by the issued procedure |
| Location and check | Drawing reference, connection location, date, operator and checking method |
| Actual observation | Setting, reading or other observation as required by that method, with units |
| Discrepancy and closure | What differed, who assessed it, the action taken and the supporting record |
A selected setting, a later reading and a visual mark describe different observations. Label the record according to what was actually done. Do not rename one as another or infer an unmeasured clamp force from a recorded wrench value. The issued method determines what that observation can establish.
For later inspections or an event-related review, keep the original handover documents available to the responsible engineer. This article sets no sampling percentage, inspection period or automatic retightening instruction. Ask for those requirements in the applicable maintenance and project documents.
Put the missing questions into the RFQ
Ask for the complete report, including its setup photographs and limitations. Request a mapping between the tested item and the supplied clamp, with the roof profile, sheet thickness, installation condition and component revision identified. Ask whether the report expressly states the sample count and failure mode; where it does not, request supporting information rather than an assumed answer.
Then request the issued installation instructions and the engineer's explanation of how the result is used for this project. Keep laboratory-document identity, engineering interpretation and site acceptance criteria as distinct parts of the file. A calculation needs a relevant evidence basis, while an installer needs an applicable instruction.
For a technical enquiry to Solaracks, include the roof-profile drawing, sheet information, proposed clamp and fasteners, layout and required connection actions. State which report you have received and which question remains open. The certifications and test reports page lists the three report references discussed here and provides a document-request route.
The purchasing decision should be traceable from the component ordered, through the evidence assessed, to the instructions and records used on the roof. Keeping the 2.71 kN result beside its model, report and torque annotation is the starting point for that chain.
Report references and review boundary
1. SGS, XMIN2511003489ML01_EN, 9 December 2025. SR-CKZ; identification on page 1, method and maximum force on page 2, torque annotation and setup photographs on page 3. 2. SGS, XMIN2403000515ML02_EN, 25 March 2024. SR-C406Y; identification on page 1, method and maximum force on page 2, setup photographs on page 3. 3. SGS, XMIN2403000515ML03_EN, 27 March 2024. SR-C700Y; identification on page 1, method and maximum force on page 2, setup photographs on page 3.
Original report contents reviewed 10 October 2026. This is a document-content review, not an authenticity confirmation from SGS or a project capacity assessment. Site installation requirements must come from the applicable issued instructions; this article does not establish them.