Diagram of the SR-C2 carport earthing path: bonding clip at the mid clamp, galvanized beam and post, J-bolts and rebar cage in the concrete pad

Short answer. An anchor bolt in concrete is a structural fixing, not an earth electrode. It becomes part of the earthing path only when it is connected to reinforcement that qualifies as an electrode under the code that applies. Under the NEC that connection can be ordinary steel tie wire, provided the footing meets the concrete-encased electrode rules in 250.52(A)(3). Under IEC 60364 the foundation electrode is designed in before the pour. Either way, the path from the module frame to the soil is traced joint by joint and measured before handover.

The question comes up on almost every carport enquiry. The modules are bonded to the frame, the frame stands on concrete, the J-bolts go deep into the pad. Is the steel not earthed already? This article follows that path on our SR-C2 galvanized steel BIPV carport, from the module frame down to the soil, and shows where the answer is yes, where it is no, and who has to decide.

One path, three segments, three owners

A fault on a module frame passes through three segments before it reaches the soil. Each segment is made by a different part, and each is usually signed off by a different person.

SegmentWhereWhat makes the contactWho fixes it
A. Module frame to mid boardUnder each mid clampNN-S-EWQ-0042 toothed bonding clipSupplied with the SR-C2 kit
B. Mid board to post baseZAM gutters and rails, hot-dip galvanized beams and postsScrewed and bolted zinc-coated steelStructural assembly, continuity measured on site
C. Post base to soilJ-bolts, reinforcement cage, concreteTie wire or welding to qualifying reinforcement, a designed foundation electrode, or a separate electrodeFoundation and electrical design

The protective conductor that runs with the PV circuits back to the inverter and the main earthing terminal is a fourth job, and it belongs to the electrical designer. Our article on grounding and bonding in solar racking covers that side and the standards behind it. This one stays with the structure.

Segment A: the bonding clip under the SR-C2 mid clamp

Module frames are anodized aluminium, and the anodic film is an electrical insulator. A mid clamp that holds a module down does not, by itself, connect the frame to anything. On SR-C2 that job belongs to a small part that sits under the mid clamp: the NN-S-EWQ-0042 bonding clip.

  • SUS304 stainless steel, 0.3 mm thick, 42 × 50.8 mm, 6 g.
  • n-shaped. The 23 mm opening slides in sideways around the clamp bolt, so the clip does not have to be threaded on.
  • Two legs, one under each module frame. Each leg carries five teeth punched on alternating faces, ten in total, so every leg has teeth facing the frame above and the mid board below.

When the mid clamp is tightened, the two frames press down on the legs, and the teeth cut through the anodic film of each frame and bite into the mid board. One clip bonds both neighbouring modules to the mid board. It works on the same principle as the earthing washer in our roof systems.

SR-C2 mid clamp with the n-shaped NN-S-EWQ-0042 bonding clip slid around the clamp bolt on the mid board
Figure 1. The NN-S-EWQ-0042 clip slides in around the clamp bolt. Module frames are shown transparent so the clip and mid board stay visible; in service both frames sit on the clip legs.

Three things undo it on site:

  • a plain washer fitted in place of the clip;
  • a clip pushed off-centre, so one frame lands on the mid board without a leg under it;
  • a clamp left short of its specified tightening. The teeth only cut when the clamp is fully tightened.

On a project under the NEC, 690.43 requires devices that bond module frames to be listed, labeled and identified for bonding. We hold no bonding or grounding listing, UL 2703 or UL 467, so on those projects the listed bonding device has to come from whoever holds the listing.

Segment B: zinc-coated steel conducts, but every joint counts

From the mid board down, SR-C2 is steel: ZAM rails and gutters, hot-dip galvanized beams and posts. Zinc and zinc-aluminium-magnesium coatings are metallic and conduct. There is no insulating layer comparable to anodizing, which is the difference from aluminium.

What the path depends on is the number of joints and how tight they stay. On SR-C2 the gutters are fixed with ST6.3 × 25 tapping screws, the rails are bolted to the beams with M12 × 40 bolts, and the beams to the posts with M16 × 60 bolts. Each one is a contact that has to stay tight for the life of the carport.

Treat that continuity as a measurement, not an assumption. Before handover, measure from the furthest module frame to the post base, bay by bay. IEC 62446-1 includes the continuity test of protective earthing and equipotential bonding conductors in its Category 1 tests (clause 6.1). A joint that reads high gets a bonding jumper, specified by the electrical designer.

Segment C: the anchor bolts, the concrete and the soil

Each SR-C2 post stands on a concrete foundation with a reinforcement cage and cast-in M24 × 475 J-bolts. Concrete is not an insulator. Kept damp by the surrounding soil, it conducts well enough that steel embedded in it can work as an earth electrode, which is how foundation earth electrodes work (DEHN, basic knowledge of earthing).

The J-bolts are there to hold the post down. Whether they also connect the post to earth depends on two things that cannot be seen once the concrete is poured: whether the bolts are connected to the reinforcement, and whether that reinforcement qualifies as an electrode under the code that applies to the project.

Under the NEC: tie wire can be enough

The NEC answers the anchor bolt question directly, in three sections of NFPA 70 (2023 edition):

  • 250.52(A)(3), concrete-encased electrode. At least 6.0 m (20 ft) of bare or zinc-coated reinforcing bar, not less than 13 mm (1/2 in) in diameter, in one length or in pieces joined by the usual steel tie wire, encased in at least 50 mm (2 in) of concrete, in a footing or foundation in direct contact with the earth. 6.0 m of bare copper conductor not smaller than 4 AWG is the alternative.
  • 250.68(C)(2), hold-down bolts. Hold-down bolts securing a structural steel column, connected to a concrete-encased electrode of that kind by welding, exothermic welding, the usual steel tie wires or other approved means, are permitted to connect the metal structural frame to that electrode.
  • 250.50, grounding electrode system. Electrodes of these types present at a building or structure are bonded together to form the grounding electrode system.

So under the NEC an SR-C2 post can be connected to earth through its J-bolts, if the cage in that pad meets 250.52(A)(3) and the J-bolts are tied to it. Both conditions belong on the foundation drawing and in the pour record, because nobody can check them afterwards. A footing separated from the soil by a vapour barrier, membrane or insulation is not in direct contact with the earth and does not qualify.

This settles the electrode side only. Under 690.43 the exposed metal of the PV system still connects to an equipment grounding conductor run with the circuits.

Under IEC 60364: the electrode is designed in

IEC 60364-5-54 (clause 542.2) recognises foundation earth electrodes embedded in concrete, but as a designed electrode, not as something every footing becomes on its own. DEHN’s construction examples to DIN 18014 and IEC 62305-3 show what designed means: a galvanized steel conductor, 10 mm round or 30 × 3.5 mm strip, laid in the foundation with at least 5 cm of concrete cover, clamped to the reinforcement at about 2 m intervals, with a terminal lug brought out for connection (DEHN DS251).

Where watertight concrete or perimeter insulation separates the foundation from the soil, the foundation conductor loses reliable earth contact. A stainless steel (V4A) ring earth electrode is then laid in the soil outside the foundation, and a functional bonding conductor stays in the slab. IEC 60364-5-54, in its annex on concrete-embedded foundation earth electrodes, also says that connections made only with wrapped iron wire are not suitable for protection purposes, so the NEC tie-wire route does not carry over to IEC projects. For a carport, the electrode, its connection to each pad and its take-off point are drawn before the pour, not discovered after it.

Section through a carport pad foundation showing J-bolts tied to the rebar cage, 50 mm concrete cover and the NEC and IEC conditions for a foundation electrode
Figure 2. When anchor bolts are part of the earthing path. The tie points between J-bolts and cage are what the NEC route depends on; the IEC route depends on a foundation electrode drawn before the pour.

Separate pads are separate electrodes

A carport row stands on a line of isolated pads, one per post, and the reinforcement in one pad is not connected to the next. Under the NEC each qualifying pad is a concrete-encased electrode, and where several are present 250.52(A)(3) permits bonding only one of them into the grounding electrode system; the bolted steel frame and the equipment grounding conductor then tie the posts together above ground. Under IEC practice the pads are usually linked by a buried earth conductor or a ring around the array. Either way, the drawing has to say how.

Where the pads are already poured with no record of a tie between J-bolts and cage, the connection cannot be proven afterwards. Treat those foundations as unconnected and have the electrical designer add an electrode, such as driven rods or a buried ring, connected to the posts above ground. The same foundation logic applies to our SR-C3 waterproof canopy, and the load side of cast-in and post-installed anchors is covered in our article on concrete solar foundations.

Where the earthing conductor lands on the post

SR-C2 posts have no factory earthing hole or terminal. The take-off point is set on the project drawing. Two practical points:

  • Avoid drilling the galvanized post on site. Where a hole cannot be avoided, repair the zinc coating around it with zinc-rich paint.
  • Do not land bare copper directly on zinc. Use a tinned or stainless steel lug so the joint does not corrode.

Before handover: four checks, four questions

CheckQuestion it answersReference
Continuity, module frame to post baseIs every frame bonded to the structure?IEC 62446-1 clause 6.1; NEC 690.43
Foundation recordAre the J-bolts tied to a qualifying cage, or is a designed or separate electrode installed?NEC 250.52(A)(3) and 250.68(C)(2); IEC 60364-5-54 clause 542.2
Earth electrode measurementDoes the electrode meet the value in the earthing design?Local code and the earthing design
Fault protectionDoes the protective device clear an earth fault?TN: fault loop impedance; TT: residual current device

Lightning protection is a separate design. A bonded steel carport is not automatically an air termination or a down conductor, and whether it connects to a lightning protection system is decided under IEC 62305-3, not on site.

Planning a carport? Send the site, module and code edition with your enquiry, and we return a structural design within 24 hours. Your electrical designer can then add the earthing take-off and foundation electrode details to the same drawings.

Standards referenced

  • NFPA 70, National Electrical Code, 2023 edition: 250.50, 250.52(A)(3), 250.68(C)(2), 690.43. NFPA 70 page. The 2026 edition is now published; check the section numbers against the edition adopted where the project is built.
  • IEC 60364-5-54:2011+AMD1:2021, Earthing arrangements and protective conductors, clause 542.2. IEC webstore.
  • IEC 62446-1:2016+AMD1:2018, Photovoltaic (PV) systems: requirements for testing, documentation and maintenance, clause 6.1. IEC webstore.
  • IEC 62305-3:2024, Protection against lightning, Part 3: physical damage to structures and life hazard.
  • DIN 18014, Foundation earth electrodes, as shown in DEHN datasheet DS251.

Frequently asked questions

Do anchor bolts in concrete earth a solar carport?

Not by themselves. They become part of the earthing path only when they are connected to reinforcement that qualifies as an electrode. Under the NEC, J-bolts tied with steel tie wire to a footing cage that meets 250.52(A)(3) are permitted by 250.68(C)(2) to connect the steel frame to that electrode. Under IEC 60364 the foundation electrode is designed in before the pour.

Is concrete a conductor?

Damp concrete in contact with soil conducts well enough for steel embedded in it to work as an earth electrode, which is how foundation earth electrodes work. A vapour barrier, membrane, waterproof concrete or perimeter insulation between the footing and the soil breaks that contact.

What bonds the module frames on the SR-C2 carport?

The NN-S-EWQ-0042 bonding clip under each mid clamp. It is an n-shaped SUS304 clip with teeth on both faces. Tightening the mid clamp drives the teeth through the anodic film of both module frames and into the mid board.

Do the separate carport footings need to be connected?

Reinforcement in one pad is not connected to the next, so the earthing design has to say how the posts reach earth. Under the NEC, where several pads qualify as concrete-encased electrodes, bonding one of them into the grounding electrode system is permitted, and the bolted steel frame links the posts above ground. Under IEC practice the pads are usually linked by a buried earth conductor or ring.

Where is the earthing conductor connected to an SR-C2 post?

SR-C2 posts have no factory earthing hole or terminal, so the take-off point is set on the project drawing. Avoid drilling the galvanized post on site, repair any hole with zinc-rich paint, and use a tinned or stainless steel lug rather than bare copper on zinc.

Get an engineered mounting quote for your project.

Share drawings, module layout, site location, wind load, snow load and corrosion environment. Solaracks will recommend the system, material, layout and packing approach.