AI product render from a Solaracks Delta ballast-support assembly reference; bare supports only, not an actual project or completed hybrid design.

Hybrid ballast-anchor solar racking combines assessed ballast with mechanical attachments. The split depends on the roof assessment, wind basis and support reactions. The old Philippine NSCP 2010 Zone 1 value was 250 km/h; it is a historical reference, not a current site design input. [1] Confirm the permit edition and project wind map before specifying the system.

AI product render from a Solaracks Delta ballast-support assembly reference, without modules or mechanical roof attachments.

AI product render from a Solaracks assembly reference. Bare ballast supports only; not an actual project or a completed hybrid attachment design.

What “NSCP Zone 1” means, and what NSCP 2015 changed

“NSCP Zone 1” still appears in specifications, tender documents and search queries, but it belongs to the 2010 edition of the National Structural Code of the Philippines. NSCP 2010 based its wind provisions on ASCE 7-05 and used three zones with 3-second gust basic wind speeds: Zone 1 at 250 km/h, Zone 2 at 200 km/h and Zone 3 at 150 km/h. [1]

Zone 1 covered Albay, Aurora, Batanes, Cagayan, Camarines Norte, Camarines Sur, Catanduanes, Eastern Samar, Isabela, Northern Samar, Quezon, Quirino, Samar and Sorsogon. [1]

NSCP 2015 §207A.5.1 assigns wind maps by occupancy category, with strength-level wind loading in the accompanying commentary. [2] These NSCP category numbers must not be substituted directly for ASCE risk categories. The following is a 2015-edition reference, not a determination of the code currently adopted for a project.

  • Fig. 207A.5-1A: Occupancy Categories III, IV and V, mean recurrence interval (MRI) 300 years.
  • Fig. 207A.5-1B: Occupancy Category II, MRI 700 years.
  • Fig. 207A.5-1C: Occupancy Category I, MRI 1,700 years.

Keep wind-speed conventions separate

Martin County reproduces a US code table pairing 200 mph ultimate speed with 155 mph nominal speed. [3] This illustrates why a number needs its load convention attached. A simple scaling of 250/√0.6 gives 322.75 km/h, but that arithmetic does not establish equivalent hazard, occupancy, return period or local adoption between Philippine code editions.

Use the historical number only to identify an old specification. Have the engineer state the adopted edition, the project category, the site map value and any special-wind-region adjustment. Never replace a required map reading with the conversion.

For canopy structures in the same regions, see our typhoon carport design guide.

Start with the roof assessment

Ballast is a permanent load, so the first input is an assessment of the existing building that states how much additional permanent load it can accept, where, and in what distribution. Roof live-load provisions describe a different load case; the remaining capacity comes from checking the structure itself.

Ask the structural engineer to confirm, for the deck or slab, supporting members, connections and local bearing:

  • the permitted additional permanent load, including modules, racking, ballast, walkways and other equipment;
  • the area basis of each allowance: roof-plan area, array footprint or local pad area;
  • long-term deflection, drainage and the governing load combinations.

An average kg/m² allowance applies at the scale it was calculated for. Concentrating the same mass on small ballast pads needs a separate local check.

Two parallel design checks for existing-roof capacity and the complete PV mounting load path.

Roof capacity and the complete load path are two separate checks.

Choose a wind method that fits the array

Florida’s building-code fact sheet explains that ASCE 7-16 introduced separate rooftop-PV wind procedures: one for arrays on low-slope roofs with limits on panel length, tilt and height, and another for panels close to and parallel to the roof. The methods also account for relevant edge and pressure effects. [4] This is a US method reference; its use on a Philippine project needs an accepted design basis.

Ask the calculation author to identify the actual method and edition, then mark its applicability limits on the layout. Record roof shape and slope, enclosure, building height, module chord and tilt, upper and lower edge heights, gaps, parapets, setbacks and row ends. A visually similar array is insufficient evidence that the method applies.

Where a prescriptive method does not fit, obtain an accepted alternative supported by appropriate wind evidence. Wind-tunnel results need to represent the proposed geometry and the load effects being designed. Check panels, mounting members, supports and the building as parts of one load path.

Before combining uplift with weight, put both on the same force direction and area basis. A panel-normal pressure cannot simply be subtracted from a vertical weight allowance without resolving its direction and reference area.

Worked example: residual uplift with and without ballast

This example is vertical-force bookkeeping on one horizontal reference area. Its 320 km/h speed, pressure multipliers, zone coefficients and stabilising multiplier are assumed sensitivity inputs. They are not a code-map reading, a code-prescribed set of coefficients, a tested product rating or a construction design. The roof allowance below is hypothetical.

Assumptions:

  • Velocity-pressure multipliers: 0.98, 1.00 and 0.85.
  • Three hypothetical zones with horizontal reference areas of 300, 210 and 90 m².
  • Effective vertical coefficients Cᵥ of 0.50, 0.90 and 1.55, used as sensitivity inputs rather than code GCrn values.
  • Array self-weight: 0.15 kPa on the same horizontal area.
  • Hypothetical assessed allowance for added permanent load, array included: 0.80 kPa.
  • Illustrative stabilising dead-load multiplier: 0.90; use the governing project combination in an actual design.

Reference pressure:

q = 0.613 × 0.98 × 1.00 × 0.85 × (320/3.6)² = 4,034.60 Pa = 4.0346 kPa

Vertical uplift is pᵥ = q × Cᵥ, and residual uplift is max[0, pᵥ − 0.90 × added weight] × reference area. With 0.65 kPa of ballast (about 66 kg/m²), total added weight is 0.80 kPa and the stabilising resistance is 0.90 × 0.80 = 0.72 kPa. Without ballast it is 0.90 × 0.15 = 0.135 kPa.

At an assumed 320 km/h and q = 4.0346 kPa, adding 0.65 kPa of ballast lowers aggregate residual uplift from 1,849.56 kN to 1,498.56 kN, a 351 kN or 19% reduction.

Hypothetical zoneReference area (m²)CᵥVertical uplift pᵥ (kPa)Residual uplift with ballast (kN)Residual uplift without ballast (kN)
A3000.502.0173389.19564.69
B2100.903.6311611.34734.19
C901.556.2536498.03550.68
Total600Not statedNot stated1,498.561,849.56

Read the 19% as a reduction in aggregate vertical force. It is not a 19% reduction in anchors or roof penetrations; those follow from support reactions in the next step.

Within this example, ballast alone balances uplift only where Cᵥ ≤ 0.72 / 4.0346 ≈ 0.18. The lowest assumed uplift, 2.0173 kPa, is well above 0.72 kPa, so this set of inputs needs attachments in every zone. A different roof, wind basis or tested coefficient set gives a different answer.

Inputs are illustrative; this is not a construction design.

Turn aggregate demand into a complete load path

Anchor layout comes from reactions at the actual supports. Racking stiffness, spans, tributary areas, torsion and load redistribution all shape those reactions, so ask for a support-reaction table rather than dividing total uplift by one anchor rating.

Check the full path in order: module and approved clamp zones → clamps and rails or trays → attachments and anchor groups → slab, deck or purlins → the building’s primary structure. For each link, verify combined tension and shear, local bearing, edge distances and substrate condition. For concrete anchorage, identify the adopted design standard and qualified anchor system. ACI 318 Chapter 17 addresses anchorage to concrete; its applicability and failure-mode checks depend on the anchor and substrate. [7] Coordinate attachment locations with drainage.

On metal roofs, confirm how the tested attachment carries force through the roof assembly into the purlins. A seam-clamp pull-off test covers the clamp; the roof clips, sheets, purlins and their connections need their own evidence.

Treat sliding and overturning as separate checks. In a simplified contact model, friction is limited by μ × max[0, 0.9(D + B) − U], where every term inside the brackets is a vertical force on the same basis and 0.9 is only the example multiplier. This expression does not determine μ or establish a design allowance. Do not credit friction once contact is lost; do not add friction and anchor capacities without a compatible load-sharing model.

Unattached arrays also need a separate seismic assessment. Portland’s official guidance describes ASCE 7 §13.6.12 conditions including risk category, building height, roof slope, displacement, clearances and weather-sensitive friction testing. [5] Those are conditions within a seismic route, not a general wind approval. The full applicable requirements and local acceptance must be checked.

Compare the three options on the same basis

For high-wind resilience, US DOE FEMP recommends avoiding fully ballasted rooftop systems and including strategic mechanical attachments. [6] That is US design guidance, not Philippine law or approval of a particular Solaracks arrangement. Treat a ballast-only proposal as requiring its own accepted project evidence.

In the example at an assumed 320 km/h, 0.65 kPa of ballast removed 351 kN of 1,849.56 kN aggregate residual uplift, so each option below is selected on roof capacity and load-path evidence rather than on ballast mass alone.

OptionPotential benefitEvidence to request before selection
Ballast onlyAvoids mechanical roof penetrationsRoof capacity; local pad pressures; accepted wind evidence; uplift, sliding and overturning; friction and separate seismic checks
HybridMay reduce attachment demand while limiting ballastAll ballast checks plus compatible load sharing, support reactions, connections and waterproofing details
Fully attachedKeeps added roof weight lowAttachment and roof-assembly capacity, support reactions, local effects and waterproofing details

Compare installed cost and maintenance alongside steel, concrete and attachment quantities. Treat the largest permitted ballast load as a boundary; the best hybrid balance is often below it. Waterproofing performance depends on the selected detail, workmanship and inspection, so ask for the penetration detail and the roofing contractor’s sign-off.

Access, walkways and maintenance

Lay out access to equipment, drains and inspection points to the applicable local fire, access and fall-protection rules. Then check the wind exposure and reactions created by that layout, particularly beside open lanes and array ends.

Support walkways on their own checked pads. Count their weight as array resistance only where the engineered load path is designed for it. Coordinate penetrations and protection pads with the roof-system supplier and roofing contractor.

For critical joints exposed to wind-induced movement, US DOE FEMP recommends vibration-resistant locking mechanisms rated to DIN 25201-4. It advises against relying on unrated locking hardware for that purpose. [6] Confirm the fastener, locking method and installation procedure for each specified connection; this guidance does not establish a universal torque.

Set inspections around the project maintenance plan, the manufacturer’s instructions and typhoon exposure. Before the typhoon season and after severe wind, check ballast position, cracked blocks, membrane damage, corrosion and attachment condition. Recheck or retighten fasteners using the procedure approved for that connection; locking or single-use hardware may need replacement. On coastal roofs, match materials and coatings to the site’s assessed atmospheric corrosivity, using ISO 9223 as a classification reference [8]; our guide to corrosion in solar mounting systems covers the selection.

How Solaracks supports a hybrid rooftop project

Solaracks can support structural calculations using SAP2000 to a project-specified standard. Confirm the calculation scope and deliverables for the proposed configuration. Provide the roof assessment, accepted wind basis and array layout; the building engineer remains responsible for the existing structure and project acceptance. More engineering notes are in our technical articles.

Related guides

  • Anti-theft solar mounting for Africa: keep clamp capacity while delaying removal
  • Solar racking landed cost and import duty to Africa: Nigeria, Kenya and Ghana
  • Dust-aware racking design for desert PV: tilt, spacing, vertical bifacial and cleaning access

Sources

  1. APEC-WW 2010 Philippines country report, Table 2 and NSCP 2010 wind-basis discussion. Historical reference.
  2. ASEP, NSCP 2015 Volume I, §207A.5.1 and Figs. 207A.5-1A/B/C. Accessible third-party transcription of the original book, not an official ASEP download; consult the issued standard for design.
  3. Martin County, Florida, wind-speed conversion table, 2023 Florida Building Code table, form revised October 2024. US convention example only.
  4. Florida Building Commission, ASCE 7-16 wind-load changes fact sheet, rooftop solar panels, page 3. Summary of method scope, not the full standard.
  5. City of Portland, Structural design requirements for solar installations, especially the separate seismic criteria. Local US guidance, not Philippine adoption.
  6. US DOE FEMP, Severe weather resilience in solar photovoltaic system design, rooftop wind resilience and critical fastened joints.
  7. ACI, Anchorage to Concrete, Matthew Senecal, Chapter 17 development, scope and anchorage failure modes. Training reference.
  8. ISO 9223:2012 catalogue, atmospheric corrosivity classification scope.

Frequently asked questions

What is the wind speed for NSCP Zone 1?

The NSCP 2010 historical value was 250 km/h, or 69.4 m/s, as a 3-second gust. It is not a current project design input. Confirm the permit edition and site-specific wind basis; do not substitute an arithmetic conversion for the applicable map.

Which provinces were in NSCP Zone 1?

The 2010 report lists Albay, Aurora, Batanes, Cagayan, Camarines Norte, Camarines Sur, Catanduanes, Eastern Samar, Isabela, Northern Samar, Quezon, Quirino, Samar and Sorsogon. This historical list does not determine the required wind speed for a new permit.

Which NSCP 2015 wind map applies to my building?

For the 2015 edition, §207A.5.1 assigns Categories III, IV and V to Fig. 207A.5-1A, Category II to 1B and Category I to 1C. Confirm the project edition and category with the engineer, using the issued standard and any applicable special-region requirements.

Can ballast alone work on a typhoon-zone roof?

There is no general approval from ballast weight alone. DOE FEMP high-wind guidance recommends mechanical attachments rather than a fully ballasted rooftop arrangement. A proposal still needs accepted wind evidence, roof capacity, sliding and overturning checks, and a separate seismic assessment under the project rules.

Does 19% less residual uplift mean 19% fewer anchors?

No. It is an aggregate vertical-force reduction in one illustrative example. Anchor quantity and positions depend on actual support reactions, anchor-group design, the substrate and other governing checks.

Does a roof live-load allowance equal spare ballast capacity?

No. Ask for an assessment of additional permanent load, including its area basis, local pad effects and the governing project combinations. An average allowance cannot by itself establish local capacity under a ballast block.

Which fasteners suit typhoon-exposed racking?

Specify a verified connection and installation procedure. DOE FEMP recommends vibration-resistant locking mechanisms rated to DIN 25201-4 for critical joints exposed to wind-induced movement. That recommendation does not provide a universal torque or a rating for every fastener.

What should a supplier provide for a hybrid roof design?

Agree the calculation scope, accepted wind method and applicability limits, support reactions, connection evidence, ballast layout and any justified friction or load sharing. Solaracks can support project-specified structural calculations using SAP2000; confirm the scope for the actual configuration.

Get an engineered mounting quote for your project.

Share drawings, module layout, site location, wind load, snow load and corrosion environment. Solaracks will recommend the system, material, layout and packing approach.

Request a quote