Smart Group: 10.5 MWp across Gazipur, Chittagong and Khulna
ItemDetail
Capacity10.5 MWp
SegmentIndustrial rooftop (grid-tied)
LocationGazipur, Chittagong & Khulna, Bangladesh
Commissioned2025
End userSmart Group
EPC / installerSCUBE Technologies
MountingSolaracks rooftop mounting structures
StatusIn execution

Smart Group’s rooftop program puts 10.5 MWp over facilities in three cities — Gazipur, Chittagong and Khulna. One client, three geographies, one mounting standard: Solaracks structures throughout, engineered and installed by EPC partner SCUBE Technologies.

Smart Group: 10.5 MWp across Gazipur, Chittagong and Khulna — figure 1

Three parallel sites multiply the ways a rooftop project can stall, so the mounting logistics carry the same discipline as the single-site flagships: per-site kitted consignments, labelled per building, letting three crews install in parallel without waiting on a shared parts pool.

The program dates from 2025 and is in execution, with completed roofs already on line. In the delivery record it stands with the Karim and Akij programs as evidence of the same pattern — Bangladeshi corporate groups electrifying entire facility portfolios rather than single roofs.

Smart Group: 10.5 MWp across Gazipur, Chittagong and Khulna — figure 2

The next case starts with site data. — Engineered design & quote within 24 hours.

Planning a similar project? Send site conditions.

Share drawings, module layout, site location, wind load, snow load and corrosion environment. Solaracks will recommend the system, material, layout and packing approach.

Request a quote