Meghna Group: 11.7 MWp on one industrial rooftop cluster
ItemDetail
Capacity11.7 MWp
SegmentIndustrial rooftop (grid-tied)
LocationSonargaon, Narayanganj, Bangladesh
Commissioned2022
End userMeghna Group of Industries
Project companySonargaon Solar Energy Ltd.
EPC / installerSCUBE Technologies
MountingSolaracks rooftop mounting structures
StatusDelivered

Meghna Group of Industries is one of Bangladesh’s largest conglomerates, and its riverside manufacturing cluster at Sonargaon carries the largest single entry in the Solaracks delivery record: 11.7 MWp of grid-tied rooftop solar, commissioned in 2022. EPC partner SCUBE Technologies engineered and installed the plant through project company Sonargaon Solar Energy Ltd.; the modules sit on Solaracks rooftop mounting structures throughout.

Meghna Group: 11.7 MWp on one industrial rooftop cluster — figure 1

The cluster’s long, continuous shed roofs are what makes a single 11.7 MWp rooftop possible — and what rewards disciplined mounting logistics. Rails, clamps and fasteners arrived as kitted consignments per roof section, so installation fronts moved down each shed without sorting parts on the roof.

The 2022 plant is the centrepiece of a longer relationship. The delivery record lists Meghna-group entries from 2.03 MWp at Sonargaon in 2020 to 2.021 MWp at Bogura in 2024, with a 4.084 MWp fifth phase, Meghna Denims and an Executive Holdings program in execution — six entries and more than 24 MWp with one client group since 2020. Repeat phases are the reference that matters most for a mounting supplier.

The next case starts with site data. — Engineered design & quote within 24 hours.

Planning a similar project? Send site conditions.

Share drawings, module layout, site location, wind load, snow load and corrosion environment. Solaracks will recommend the system, material, layout and packing approach.

Request a quote