Array installation underway on a metal deck roof, hardware landing where the crew needs it.
- Roof: metal deck
- Focus: load path and install sequence
Following the load path down
On a metal deck the uplift path runs module → clamp → rail → foot → fixing → sheet → purlin. Each link has to be sized, and the fixing must land on structure, not just skin — which is why our layouts mark purlin lines, not just a spacing. See metal roof systems and our engineering process.
Planning a similar installation?
Send your site details — roof or soil type, module count, location — and receive a stamped structural design & quote within 24 hours.


