Ground Screw Foundations for a GTS Structure

Ground screws going in for a GTS ground-mount structure — the foundation stage that sets up everything above it.

  • Foundation: ground screws
  • Structure: GTS ground mounting system

Screws versus concrete

Ground screws install in minutes, need no cure time, can be removed and reused at end of life, and take up grade changes by adjusting depth. Foundation capacity should always be confirmed against the actual soil — we recommend site pull-out tests at project start. See ground mounting systems and the related GTS on ground screws in Japan.

Planning a similar installation?

Send your site details — roof or soil type, module count, location — and receive a stamped structural design & quote within 24 hours.

Ground mounting systems  |  Request a quote  |  WhatsApp us

Planning a similar project? Send site conditions.

Share drawings, module layout, site location, wind load, snow load and corrosion environment. Solaracks will recommend the system, material, layout and packing approach.

Request a quote