Components
PostSquare steel tube, hot-dip galvanized; a front and a rear post per frame, each on 4 pre-buried M16 × 300 bolts
BeamHot-dip galvanized steel beam bolted onto the posts with M16 × 150 hex bolts
RailZAM coated steel rail fixed across the beams; carries the gutters and the modules
Rail joinerJoins two rails in the middle of a run with 8 M12 × 40 bolts
Portrait gutterZAM coated steel gutter along each row joint, screwed to the rails; joined with a 350 mm overlap
Landscape gutterZAM coated steel gutter laid between the modules across the rows as they go in, so the cross joints drain too
Main gutterTransverse gutter at the eaves; collects the gutters and carries the water to the column line
Panel supportFor landscape modules: fitted between the portrait gutters with ST6.3 × 25 screws
End clamp with bearing boardHolds the outer module edge; fixed with one self-tapping screw on each side
Mid clamp with bearing boardHolds two modules over a gutter; fixed with one self-tapping screw on each side
Bonding clip NN-S-EWQ-0042n-shaped SUS304 stainless steel clip, 0.3 mm, with teeth on both faces; slides in under each mid clamp so one leg sits under each module frame, and the teeth pierce the anodized frames when the clamp is tightened
EPDM sealingSeals the gap between neighbouring modules
Mid coverCaps the joint over the clamps, on top of the modules
Pre-buried bolts4 M16 × 300 bolts per post, cast into the foundation; chemical anchors as an option
Technical parameters
Carport Waterproof Canopy SR-C3: indicative parameters. Final values follow project engineering.| Parameter | Value | Basis |
|---|
| System | Front and rear square-tube steel posts with a beam bolted on top; ZAM coated steel rails across the beams; the modules form the roof | Solaracks spec |
|---|
| Steel grade | Posts and beams: Q355B structural steel, yield strength 355 MPa | Solaracks spec |
|---|
| Drainage | A gutter under every module joint: portrait gutters along the rows, landscape gutters across them, and a main gutter at the eaves that carries the water to the column line | Solaracks spec |
|---|
| Joint seal | EPDM sealing in the gap between modules; mid cover over the clamps | Solaracks spec |
|---|
| Module clamping | End and mid clamps with bearing boards, each fixed with one self-tapping screw on each side | Solaracks spec |
|---|
| Module bonding | NN-S-EWQ-0042 bonding clip under each mid clamp: SUS304 stainless steel, 0.3 mm, with teeth on both faces that pierce the anodized module frames when the clamp is tightened | Solaracks spec |
|---|
| Module orientation | Portrait or landscape; landscape layouts add panel supports between the portrait gutters | Solaracks spec |
|---|
| Gutter sections and fall | Sized to the site rainfall intensity on the engineered design | Project-specific |
|---|
| Reference bay | 3800 mm front to rear and 5600 mm wide | Solaracks spec |
|---|
| Bay span, width, clear height and tilt | Set per project and confirmed on the engineered design | Project-specific |
|---|
| Foundation | Concrete foundations with 4 pre-buried M16 × 300 bolts per post; chemical anchors as an option | Solaracks spec |
|---|
| Foundation size and spacing | Recommended on the foundation drawing; a local civil engineer confirms it from the soil conditions | Project-specific |
|---|
| Fasteners | Beam to post: M16 × 150 hex bolts. Rail joiner: 8 M12 × 40 bolts. Gutters, panel supports and clamps: ST6.3 × 25 self-tapping screws | Solaracks spec |
|---|
| Design wind speed | Up to 200 mph (89 m/s), ASCE 7-22 basic wind speed | Project-specific |
|---|
| Snow load | Per site | Project-specific |
|---|
| Frame coating | Posts and beams hot-dip galvanized after fabrication | ISO 1461 |
|---|
| Zinc coating thickness | 85 µm or more on the posts and beams; bolts and other small parts carry a thinner zinc coat | Solaracks spec |
|---|
| Rails and gutters | ZAM (Zn-Al-Mg) coated steel | Solaracks spec |
|---|
| Rail and gutter coating | ZM275 (275 g/m²) as standard; ZM310 or ZM350 for high-corrosion sites | Solaracks spec |
|---|
| Clamps and mid covers | Aluminium | Solaracks spec |
|---|
| Site connections | All bolted or screwed; nothing is welded on site | Solaracks spec |
|---|
| Damaged zinc | Wire-brush and coat with zinc-rich paint of 70% zinc or more | Solaracks spec |
|---|
| Bolts | Carbon steel bolts on the steel frame, grade 8.8, so no stainless steel touches the coating: hot-dip galvanized below C4; CX-grade TDC thermo-diffusion zinc coated at C4 and above | Solaracks spec |
|---|
| Torque | Grade 8.8 bolts on the steel frame: M10 44 to 46 N·m; M12 80 to 82 N·m; M16 and larger bolts to the values on the engineered drawing; M8 module clamp bolts 15 to 17 N·m | Solaracks spec |
|---|
| Electrical | Cabling, earthing and any EV charging to local code, by a qualified electrician | Project-specific |
|---|
| Warranty | 12 years on the structure; hot-dip galvanized coating 5 years; ZAM coating 10 years on the rails and gutters (Solaracks Limited Warranty SR-WT-001) | Solaracks spec |
|---|
Material and coating options
| Parameter | Value |
|---|
| Material | Q355B structural steel posts and beams, hot-dip galvanized after fabrication; ZAM coated steel rails and gutters; aluminium clamps and mid covers; EPDM sealing; carbon steel bolts, grade 8.8, hot-dip galvanized below C4 and CX-grade TDC coated at C4 and above |
|---|
| Finish / coating | Posts and beams hot-dip galvanized to ISO 1461, 85 µm or more; rails and gutters ZAM coated, ZM275 standard, ZM310 or ZM350 for high-corrosion sites; clamps and mid covers aluminium |
|---|
Engineering basis
Solaracks, a solar mounting manufacturer in Xiamen, China, since 2012, calculates every SR-C3 carport for its site. Wind and snow loads come from the project's code, such as ASCE 7-22, JIS C 8955, or the AS/NZS 1170 and EN 1991-1 series. Static checks follow that code, and the frame is modelled in SAP2000 where the layout needs it. Foundations are sized from the soil report, and the foundation drawings are issued with the structural design so the civil works can start before the structure arrives. ISO 9223 classifies the site, not the product; the coating and bolt grades in the parameter table are the Solaracks specification for each class. The reference bay in the parameter table is an example: each project is engineered for its site, and sections, spans, tilt and loads are confirmed on the engineered design. The gutter sections and fall are sized to the site rainfall intensity. The foundation size on the drawing is a recommendation; a local civil engineer confirms it from the soil conditions. Posts and beams are hot-dip galvanized to ISO 1461, and on site every connection is bolted or screwed, so no welding burns off the zinc. The design comes back with layout, elevation and section drawings and a bill of materials per bay and per project. Send complete site data and the structural design and quote come back within 24 hours.
- ASCE 7-22
- AS/NZS 1170.2
- JIS C 8955
- EN 1991-1-4
- ISO 9223 (site corrosivity)
How Solaracks runs wind load calculations →
Installation and packing notes
- Set out the canopy from the engineered layout drawing and cast the pre-buried bolts into the foundations at the positions on the foundation drawing. The foundation size on the drawing is a recommendation; a local civil engineer confirms it from the soil conditions.
- Fix each post on its 4 pre-buried M16 × 300 bolts.

- Bolt the beam onto the posts with M16 × 150 hex bolts, and repeat until every frame stands.

- Fix the rails onto the beams; where a run needs two rails, join them with a rail joiner and 8 M12 × 40 bolts.

- Fix the portrait gutters on the rails with 2 ST6.3 × 25 self-tapping screws on each side. To join two gutters, overlap them by 350 mm and fix them with 6 screws on each side.


- For landscape modules, fit the panel supports between the portrait gutters with 2 ST6.3 × 25 screws; join supports with an overlap on a rail. Fit the main gutter at the eaves as on the drawing.

- Fix the end and mid clamps with their bearing boards, one self-tapping screw on each side, and place the modules; slide an NN-S-EWQ-0042 bonding clip in under each mid clamp so one leg sits under each module frame, and lay a landscape gutter between the modules as they go in.


- Fit the EPDM sealing between the modules and the mid cover on top.


- Tighten every bolt to the torque in the parameter table and check that every part on the packing list is fitted. Cabling and earthing by a qualified electrician, to local code.
Inspect the carport once a year and after winds above 80% of the design wind speed: check the frames for movement, re-check bolt torque, make sure no clamp has lifted from its module and clear leaves from gutters and covers. Wire-brush any rust on galvanized parts and coat it with zinc-rich paint of 70% zinc or more. In polluted or coastal air, rinse aluminium parts with clean water during panel cleaning.
Each canopy ships as a project kit: posts, beams, rails, gutters and covers labelled per bay, clamps and fasteners boxed by type, with a bill of materials per bay and a packing list. Store galvanized parts dry and unbundled until they go up, so they do not get white rust. Standard items usually ship in 15 to 20 days; the lead time and packing list are confirmed before the order closes.
Packing and installation control →
Related systems and guides
Frequently asked questions
How does SR-C3 keep the bays dry?
Every joint between modules sits over a gutter. Portrait gutters run along the rows, landscape gutters go in across them as the modules are laid, and the main gutter at the eaves carries the water to the column line. EPDM sealing between the modules and mid covers over the clamps close the joints from above.
What does the frame look like?
Each frame is a pair of square-tube posts, front and rear, with a beam bolted on top in hot-dip galvanized Q355B steel. ZAM coated steel rails run across the beams. The bay between the front and rear posts stays clear for parking.
How big is a bay?
The reference bay is 3800 mm front to rear and 5600 mm wide. Span, width, clear height and tilt are set per site and confirmed on the engineered design.
How is it fixed to the ground?
Each post stands on 4 M16 × 300 bolts cast into a concrete foundation; chemical anchors are an option. The foundation size on the drawing is a recommendation, and a local civil engineer confirms it from the soil conditions.
How are the gutters sized?
From the rainfall intensity at the site. Send it with the enquiry, and the gutter sections and fall come back sized to it on the engineered design.
How is the steel protected?
Posts and beams are hot-dip galvanized to ISO 1461, with 85 µm or more of zinc; bolts and other small parts carry a thinner coat. Rails and gutters are ZAM coated steel, ZM275 as standard and ZM310 or ZM350 for high-corrosion sites. On site every connection is bolted or screwed, so no welding burns off the coating.
Which bolts hold the frame?
Grade 8.8 carbon steel bolts: hot-dip galvanized below C4 and CX-grade TDC coated at C4 and above. The beams bolt to the posts with M16 × 150 bolts and the rail joiners take 8 M12 × 40 bolts; gutters, panel supports and clamps are fixed with ST6.3 × 25 self-tapping screws.
What wind speed can SR-C3 be designed for?
Each canopy is calculated for its site, for ASCE 7-22 basic wind speeds up to 200 mph (89 m/s). Sections, spans and foundation sizes follow from the site wind and snow loads and the module layout.
How are the module frames bonded?
An NN-S-EWQ-0042 bonding clip sits under each mid clamp. It is an n-shaped SUS304 clip with teeth on both faces: tightening the clamp drives the teeth through the anodized film of both module frames. The earthing take-off point on the posts is set on the project drawing.
How is SR-C3 different from SR-C2?
SR-C3 stands on front and rear square-tube posts, with portrait gutters, landscape gutters and a main gutter under the module joints. SR-C2 stands on single posts, with "M" gutters, or Z rails and side gutters, under the joints.
What warranty comes with SR-C3?
12 years on the structure, 5 years on the hot-dip galvanized coating and 10 years on the ZAM coating of the rails and gutters, under Solaracks Limited Warranty SR-WT-001.
How fast can I get an SR-C3 design and quote?
Within 24 hours of receiving complete site data: the parking plan or number of bays, the location or design wind speed and snow load, the soil data and the module model. Standard items usually ship in 15 to 20 days; each quote confirms the date.