SR-W9 is a rooftop maintenance walkway in ZAM (zinc, aluminium, magnesium) coated steel, punched with staggered round holes. Each hole has a raised collar that gives grip underfoot, and the open holes let water and debris drain through. The plank is a folded steel channel; the regular plank SR-Z-ZWP350-3000 is 3000 mm long, 350 mm wide and 30 mm high in 1.2 mm sheet and weighs 12 kg. Planks 2000 mm long, 300 or 400 mm wide, 40 mm high or in 1.5 mm sheet are made to order. End clamps hold the planks on short rails across the route, 1000 to 1200 mm apart; on Klip-Lok 406 roofs the rails sit on SR-CY406 seam clamps. An aluminium angle joiner, screwed with ST6.3 × 25 SS410 self-tapping screws, links two planks end to end.

FitsMetal roofs with solar arrays, including Klip-Lok 406: service routes between rows and to inverters
Fixes intoShort rails across the route, held by end clamps; the rails sit on SR-CY406 seam clamps on Klip-Lok 406 roofs, or on L-feet or seam clamps as for the array
LimitsA route for people on foot, not a floor for stored loads. For heavy daily traffic with trolleys, see SR-W4
SR-W9 ZAM punched walkway plank held by end clamps on two short rails
End clamps hold the punched plank on the short rails; the raised collars give grip and the holes drain.
SR-W9 ZAM steel plank with staggered round holes and raised collarsSR-W9 ZAM punched walkway planks in the factoryDrawing of the regular SR-W9 plank SR-Z-ZWP350-3000: 3000 × 350 × 30 mm, 1.2 mm sheet

Benefits

  1. Staggered round holes with raised collars grip underfoot and let water and debris drain through.
  2. The regular 3000 × 350 mm plank in 1.2 mm sheet weighs 12 kg, and the size is made to order.
  3. ZAM coating with a 10-year coating warranty, and 12 years on the structure (SR-WT-001).

Compatible roof and site types

  • Klip-Lok 406 roofs
  • Trapezoidal and standing-seam metal roofs
  • Service routes between array rows

Components

  • SR-W9 punched ZAM walkway plankPunched ZAM plankFolded S350 steel channel, ZAM coated, with staggered round holes and raised collars; regular size 3000 × 350 × 30 mm
  • SR-W9 end clamp holding the plank edge on a short railEnd clampAluminium clamp with its bolt; holds the plank edge down on the short rail
  • SR-W9 aluminium angle joinerAngle joinerAluminium angle that links two planks end to end
  • Self-tapping screw ST6.3 × 25SS410 stainless steel; fixes the angle joiner to the planks
  • SR-CY406 seam clamp for Klip-Lok 406 ribsSeam clamp SR-CY406Aluminium clamp closed on the Klip-Lok 406 rib with M8 × 20 bolts; the short rail fixes to it with a T-module
  • Short railAluminium rail across the route under each support line

Technical parameters

Walkway ZAM Punched SR-W9: indicative parameters. Final values follow project engineering.
ParameterValueBasis
PlankFolded ZAM steel channel punched with staggered round holes; a raised collar around each holeSolaracks spec
MaterialS350 steel with Zn-Al-Mg (ZAM) coating, silverSolaracks spec
Coating weightZM275 (275 g/m²) as standard; ZM310 or ZM350 for high-corrosion sitesSolaracks spec
Regular plankSR-Z-ZWP350-3000: 3000 × 350 × 30 mm in 1.2 mm sheetSolaracks spec
Made to orderLength 2000 or 3000 mm; width 300, 350 or 400 mm; height 30 or 40 mm; sheet 1.2 or 1.5 mmSolaracks spec
Weight per 3000 mm plank, 30 mm high1.2 mm sheet: 12 kg (350 mm wide) or 13 kg (400 mm); 1.5 mm sheet: 14.5 kg (350 mm) or 16 kg (400 mm)Solaracks spec
Plank fixingEnd clamps hold the planks on short rails across the routeSolaracks spec
Support spacing1000 to 1200 mm; set from the loads the route must carryProject-specific
Roof fixingOn Klip-Lok 406 roofs the rails sit on SR-CY406 seam clamps closed on the ribs with M8 × 20 bolts; on other roofs, L-feet or seam clamps as for the arraySolaracks spec
Plank jointsAluminium angle joiner between two planks, fixed with ST6.3 × 25 SS410 stainless steel self-tapping screwsSolaracks spec
Roof zonesFixings follow the same roof zones as the array; route and fixing count are checked per projectProject-specific
TorqueM8 bolts 15 to 17 N·m with a torque wrenchSolaracks spec
Warranty12 years on the structure; ZAM coating 10 years (Solaracks Limited Warranty SR-WT-001)Solaracks spec

Material and coating options

ParameterValue
MaterialS350 steel with ZAM (Zn-Al-Mg) coating; aluminium rails, end clamps and angle joiners; ST6.3 × 25 SS410 stainless steel self-tapping screws
Finish / coatingZAM (Zn-Al-Mg) coated sheet, silver; ZM275 standard, ZM310 or ZM350 for high-corrosion sites

Engineering basis

Solaracks, a solar mounting manufacturer in Xiamen, China, since 2012, lays out every SR-W9 route on the roof plan together with the array. A walkway is a maintenance route for people on foot, not a floor for stored loads: the support spacing and the fixings into the roof come from the roof type and the loads the route must carry, and the fixings follow the same roof zones as the array. ISO 9223 classifies the site, not the product; the material and coating in the parameter table are chosen for that class. The supports are 1000 to 1200 mm apart for the regular plank; each project gets its own layout. Send the roof type, the route layout and the purlin spacing and the layout and quote come back within 24 hours.

How Solaracks runs wind load calculations →

Installation and packing notes

  1. Mark the walkway route and the support lines from the layout drawing, 1000 to 1200 mm apart.
  2. On Klip-Lok 406 roofs, close the SR-CY406 seam clamps on the ribs and tighten the M8 × 20 bolts to 15 to 17 N·m; on other roofs, fix L-feet or seam clamps as for the array.SR-CY406 seam clamp closed on a Klip-Lok rib
  3. Fix the short rails across the route to the clamps with T-modules and tighten the bolts.Short rail fixed to a seam clamp with a T-module
  4. Lay the planks on the rails and hold them with the end clamps, tightened to 15 to 17 N·m.SR-W9 ZAM punched walkway plank held by end clamps on two short rails
  5. To join two planks end to end, fit the aluminium angle joiner between them and fix it with ST6.3 × 25 SS410 self-tapping screws.SR-W9 aluminium angle joiner

Walk the route once a year and after a storm: re-check bolt torque and screws, replace any missing clamp and clear debris from the walkway surface. Keep the route free of stored materials.

Planks ship stacked on pallets, with rails, end clamps, joiners and screws boxed by type, each with a packing list and part labels. Standard items usually ship in 15 to 20 days; each quote confirms the date.

Packing and installation control →

Downloads

Related systems and guides

Structural design & quote: 24 hWarranty: 12 years structure, 10 years ZAM coating

Frequently asked questions

What size are the SR-W9 planks?

The regular plank SR-Z-ZWP350-3000 is 3000 mm long, 350 mm wide and 30 mm high, in 1.2 mm ZAM-coated sheet, and weighs 12 kg. Planks 2000 mm long, 300 or 400 mm wide, 40 mm high or in 1.5 mm sheet are made to order.

Why round holes with collars?

The raised collar around each hole gives grip underfoot, and the open holes let water and debris drain through the plank.

How is it fixed to the roof?

End clamps hold the planks on short aluminium rails across the route. On Klip-Lok 406 roofs the rails sit on SR-CY406 seam clamps closed on the ribs with M8 × 20 bolts; on other roofs they fix with L-feet or seam clamps as for the array.

How far apart are the supports?

1000 to 1200 mm. The spacing is set per project from the loads the route must carry.

How are planks joined?

An aluminium angle joiner sits between two planks and is fixed with ST6.3 × 25 SS410 stainless steel self-tapping screws.

How does SR-W9 differ from SR-W8?

Both are ZAM coated steel. SR-W9 is a punched channel with round holes, 30 or 40 mm high, held by end clamps; SR-W8 is a ribbed plank 20 mm high, screwed to the rails through its rib grooves.

What warranty comes with SR-W9?

12 years on the structure and 10 years on the ZAM coating, under Solaracks Limited Warranty SR-WT-001.

How fast can I get an SR-W9 layout and quote?

Within 24 hours of receiving the roof type and profile, the route length and layout, and the purlin or rafter spacing. Standard items usually ship in 15 to 20 days; each quote confirms the date.

Get an engineered mounting quote for your project.

Share drawings, module layout, site location, wind load, snow load and corrosion environment. Solaracks will recommend the system, material, layout and packing approach.

Request a quote
×

Request this document

Enter your company and contact details. We review each request and email you a download link once it is approved.

Requested document Requested document

Close