SR-R3 “Claw” is a rail-based solar mount for standing seam, Klip-Lok and other clip-fixed metal roofs. A seam clamp grips each seam or rib with bolts or set screws, so no hole goes through the roof sheet. Rails fix to the clamps, either on an L connector at the side or as an SR-RH4 H rail sitting on the clamp top, and the modules clamp to the rails. An SR-R3 array can be designed per project for ASCE 7-22 basic wind speeds up to 200 mph (89 m/s).

FitsStanding seam, Klip-Lok 406 and 700, Kalzip round seam, rhombic and vertical folded seam roofs; the clamp is chosen from the Roof clamp selection guide
Fixes intoThe seam or rib: one aluminium seam clamp per point, closed with M8 bolts, or M8 set screws on SR-C5; nothing goes through the sheet
LimitsNot for screw-fixed trapezoidal or corrugated sheet (use SR-R5 or SR-R2), tile roofs (use SR-R8), or a seam the clamp guide does not list; send a photo of the seam first. Standard range: roof slopes up to 60° and buildings up to 20 m; beyond that, Solaracks checks the project first
Solaracks seam clamps for Klip-Lok, Kalzip, rhombic and folded seam roofs
Each seam clamp grips its own seam profile; the rails, module clamps and earthing parts above it stay the same. The Roof clamp selection guide matches the clamp to the roof.
SR-R3 build with seam clamp, L connector and side railSR-R3 build with seam clamp and SR-RH4 H rail on the clamp topSR-R3 with SR-C5 seam clamps on a vertical seam roof, completed arrayInstaller setting out SR-R3 seam clamps on a standing seam roofLarge SR-R3 array on a standing seam roof

Benefits

  1. Seam clamps grip the seam or rib with bolts or set screws, so the roof sheet is never drilled.
  2. One rail system covers Klip-Lok, Kalzip, rhombic and folded seams: only the clamp changes, chosen from the selection guide.
  3. Two rail layouts: SR-RH4 sits straight on the clamp top and saves the L connector, while side rails on L connectors span further.

Compatible roof and site types

  • Standing seam metal roofs
  • Klip-Lok 406 and Klip-Lok 700 concealed-fix roofs
  • Kalzip round seam roofs
  • Rhombic (diamond) and vertical folded seam roofs
  • Framed modules, portrait or landscape

Components

  • Kliplok 406 standing seam clamp with claw-grip jaws for non-penetrating roof attachmentSeam clamp6005-T5 aluminium, one model per seam profile: SR-C406 and SR-C700 for Klip-Lok, SR-CKZ for Kalzip, SR-CDO for rhombic seams, SR-C5, SR-C5L and SR-CLK for folded seams. Closed with M8 bolts, or M8 set screws on SR-C5
  • SR-C5 seam clamp with L connector and side rail, sectionL connectorAluminium L connector bolted to the seam clamp; the side rail fixes to it with a T-bolt
  • SR-RH4 H rail, anodized aluminium bottom-mount solar railH rail SR-RH4Anodized 6005-T5 aluminium bottom-mount rail; sits on the clamp tops and fixes with a T-module, so no L connector is needed. Joined with its own splice
  • SR-R1S rail, anodized 6005-T5 aluminium profile for the SR-R5 L-foot systemRail SR-R1SAnodized 6005-T5 aluminium; same T-bolt fixing, span set per project
  • SR-R5 rail splice SR-S1S with two M8 boltsRail joiner SR-S1SJoins SR-R1S rails; slides into the groove on the back of the rail, with two M8 × 12 stainless bolts, one into each rail
  • Pre-assembled T-module bolt for the rail channelT-modulePre-assembled T-bolt that tilts into the rail channel and turns to lock; its thread must not stand below the T-module
  • SR-MCU U-shape inter clamp, pre-assembled to tilt into the rail channelInter clamp SR-MCUU-shape, pre-assembled with its bolt; tilts into the channel and holds two frames with a 20 mm gap. T-shape SR-MCT (17 mm gap) is the alternative
  • SR-EC end clamp for 30 to 35 mm module framesEnd clamp SR-ECPre-assembled, tilts into the channel; holds the last module, 30 to 35 mm frames
  • Anodized aluminum adjustable end clamp for solar modules ranging 32 to 50 mm thickAdjustable end clamp SR-AECOption for 32 to 50 mm frames
  • SR-EW1 earthing clip that bites through the anodizing of both module framesEarthing clip SR-EW1Stainless steel 304 clip under each inter clamp; its teeth bite through the anodizing of both frames and bond them to the rail
  • SR-GL1 grounding lug that lands the earth conductor on the railGrounding lug SR-GL1Un-anodized aluminium body with a toothed SS304 clip; one per continuous rail run lands the earth conductor

Technical parameters

Metal-Roof Standing-Seam Mount SR-R3 “Claw”: indicative parameters. Final values follow project engineering.
ParameterValueBasis
Roof typesStanding seam, Klip-Lok 406 and 700, Kalzip, rhombic and vertical folded seam metal roofsSolaracks spec
Seam clampChosen per seam profile from the Roof clamp selection guide; no hole through the sheetSolaracks spec
Rail optionsSR-R1S or SR-R1SY on an L connector, or SR-RH4 directly on the clamp topSolaracks spec
Clamp spacingSet from the seam pitch, module size and site wind and snow loadsProject-specific
Roof slopeUp to 60°Solaracks spec
Building heightUp to 20 m in the standard range; taller buildings and cyclonic regions are checked per projectSolaracks spec
Rail end overhangUp to 30% of the adjacent clamp spacingSolaracks spec
Roof zonesKeep 600 mm clear of the roof edges; fixings are closer together in the end zones (B/3)Solaracks spec
Module orientationPortrait or landscape, flush with the roofSolaracks spec
Module frame height30 to 35 mm with SR-EC; 32 to 50 mm with SR-AECSolaracks spec
Clamping zoneWithin L/4 of each frame end, never on the glass; check the module maker's manualSolaracks spec
Design wind speedUp to 200 mph (89 m/s), ASCE 7-22 basic wind speedProject-specific
Snow loadPer siteProject-specific
Material6005-T5 aluminium, anodized; tensile strength 260 MPa, yield 240 MPaSolaracks spec
Anodizing by site class12 µm for C2 to C3; 15 µm for C4; 20 µm for C5 (ISO 9223)Solaracks spec
BoltsA2-70 (304) below C4; A4 (316) at C4 and aboveSolaracks spec
TorqueEvery M8 seam clamp, rail and module clamp bolt 15 to 17 N·m with a torque wrench; SR-C5 M8 set screws 10 to 12 N·mSolaracks spec
GroundingSR-EW1 clips under the inter clamps, bolted rail joiners and one SR-GL1 lug per rail run; continuity checked before the array is energisedSolaracks spec
Warranty12 years on aluminium and stainless parts; anodized finish appearance 5 years (SR-WT-001)Solaracks spec

Material and coating options

ParameterValue
Material6005-T5 aluminium, anodized; stainless steel bolts
Finish / coatingAnodized: 12 µm standard; 15 µm for C4 and 20 µm for C5 sites

Engineering basis

Solaracks, a solar mounting manufacturer in Xiamen, China, since 2012, calculates every SR-R3 array for its site. Wind and snow loads come from the project's code, such as ASCE 7-22, JIS C 8955, or the AS/NZS 1170 and EN 1991-1 series. Static checks follow that code, and the frame is modelled in SAP2000 where the layout needs it. The whole array is designed for the worst roof zone rather than zone by zone. ISO 9223 classifies the site, not the product; the anodizing and bolt grades in the parameter table are the Solaracks specification for each class. The clamp is chosen for the seam profile first; the clamp spacing then comes from the seam pitch, the rail span and the roof zone. Profiles are anodized before they are cut and drilled, so cut ends and bolt holes are bare aluminium. Send complete site data and the structural design and quote come back within 24 hours.

  • ASCE 7-22
  • AS/NZS 1170.2
  • JIS C 8955
  • EN 1991-1-4
  • ISO 9223 (site corrosivity)

How Solaracks runs wind load calculations →

Installation and packing notes

  1. Match the clamp to the seam with the Roof clamp selection guide, then mark the clamp positions from the layout: 600 mm clear of the roof edges and closer together in the end zones.SR-C406 seam clamp closed on a Klip-Lok rib
  2. Seat each clamp fully on the seam and tighten its M8 bolts to 15 to 17 N·m, or the SR-C5 set screws to 10 to 12 N·m. The clamp grips the seam; nothing goes through the sheet.SR-C5 seam clamp on a vertical folded seam
  3. Fit the rails: bolt an L connector to each clamp and fix the side rail to it with a T-bolt, or set SR-RH4 straight on the clamp tops with the T-modules. Level each run and tighten to 15 to 17 N·m.Rails fixed to seam clamps on a standing seam roof
  4. Join rails: slide the joiner halfway into the first rail and tighten, push the next rail on and tighten the second bolt. Keep the rail end overhang within 30% of the clamp spacing.Rail joiner connecting two rails with two bolts
  5. Fit the end clamp at the row end. At each joint, drop an SR-EW1 clip and slide the inter clamp in loose, 2 to 3 turns; push the next module up to it and tighten to 15 to 17 N·m, within L/4 of each frame end.Inter clamp between two modules on an SR-R3 rail
  6. Earth the array: fit one SR-GL1 lug per continuous rail run, land the earth conductor and check continuity before the array is energised. Electrical work by a qualified electrician, to local code.Completed SR-R3 array on a standing seam roof

Run bolts in with a 6 mm hex bit, set the final torque with a torque wrench and mark each bolt. Re-check bolts, clamps and the earth connection once a year and after a severe storm. In polluted or coastal air, rinse the aluminium with clean water during panel cleaning.

Seam clamps ship with their bolts or set screws, rails on pallets and module clamps pre-assembled, each with a packing list and part labels. Standard items usually ship in 15 to 20 days; each quote confirms the date.

Packing and installation control →

Downloads

Related systems and guides

Calculation basis: AS/NZS 1170.2 / ASCE 7-22Structural design & quote: 24 hWarranty: 12 years

Frequently asked questions

Does SR-R3 make holes in the roof?

No. Seam clamps grip the seam or rib with bolts or set screws, and nothing goes through the sheet, so the fixings need no extra waterproofing. Check the roofing maker's terms for attachments to the seams.

Which seam clamp do I need?

It depends on the seam profile. The Roof clamp selection guide in Downloads covers 34 profiles, from Klip-Lok and Kalzip to rhombic and folded seams. Send a photo of one seam against a tape measure and Solaracks confirms the clamp.

Side rails or the SR-RH4 H rail?

SR-RH4 sits on the clamp top and saves the L connector at every point. Side rails SR-R1S and SR-R1SY are stiffer, so they suit longer spans and higher loads. The structural calculation picks the lighter layout that passes.

What wind speed can SR-R3 be designed for?

Up to 200 mph (89 m/s), the ASCE 7-22 basic wind speed, a 3-second gust at 10 m in Exposure C, with a seam clamp at every fixing point. The clamp spacing is set per project for the worst roof zone.

What torque do SR-R3 fasteners need?

Every M8 seam clamp, rail and module clamp bolt 15 to 17 N·m with a torque wrench. SR-C5 grips with M8 set screws at 10 to 12 N·m.

Does SR-R3 need bonding jumpers between rails?

No, in the Solaracks design. SR-EW1 clips bond the frames to the rails, and the bolted rail joiners bond rail to rail. One SR-GL1 lug per continuous rail run lands the earth conductor.

How fast can I get an SR-R3 design and quote?

Within 24 hours of receiving complete site data: the roof type and a layout, the location or design wind speed and snow load, and the module model. Standard items usually ship in 15 to 20 days; each quote confirms the date.

What should I send for an SR-R3 quote?

A photo of one seam against a tape measure, the sheet thickness and the seam pitch, the roof slope and building height, the module model and layout, and the site location or design wind and snow loads. The distance to the sea, or the ISO 9223 class, sets the anodizing and bolt grade.

Get an engineered mounting quote for your project.

Share drawings, module layout, site location, wind load, snow load and corrosion environment. Solaracks will recommend the system, material, layout and packing approach.

Request a quote
×

Request this document

Enter your company and contact details. We review each request and email you a download link once it is approved.

Requested document Requested document

Close