SR-G10 is a high-clearance agrivoltaic mount in hot-dip galvanized S355 steel: it lifts the array 3 m or more above the field, so the same land grows a crop and generates power. Portal frames of columns, top beams and knee braces stand on U-bases on SR-GS galvanized ground screws, with no concrete, and cross-braces and tie beams lock the bays into one grid. Modules lie in landscape in spaced rows; the row gaps are tuned to the crop, passing roughly two-thirds of daylight to the ground. The frame members are hot-dip galvanized after they are cut and punched, with 85 µm or more of zinc to ISO 1461; the module rails are ZAM (zinc, aluminium, magnesium) coated steel. Every joint is bolted, with no site welding. SR-G10 is designed per project for ASCE 7-22 basic wind speeds up to 200 mph (89 m/s).

FitsFarmland where crops keep growing and tractors or hand-work pass under the array
Fixes intoHot-dip galvanized SR-GS ground screws, with no concrete; a U-base joins each column to its screw
LimitsClearance, row gaps and tilt are set per project for the crop, the machinery and the latitude. For an aluminium frame, see SR-G6
MaterialS355 carbon steel frame, hot-dip galvanized to ISO 1461; ZAM coated steel module rails; grade 8.8 carbon steel bolts
SR-G10 hot-dip galvanized steel agrivoltaic frame with landscape module rows high above the ground
Engineering render: portal frames on ground screws carry spaced landscape rows 3 m or more above the crop.
SR-G10 portal frames with knee braces, cross-braced bays and tie beamsSR-G10 bolted joint of column, top beam and knee braceSR-G10 module rails with bolted joints carrying the modules

Benefits

  1. Crops keep growing and machinery passes under the array, with 3 m or more of crop clearance.
  2. S355 steel, hot-dip galvanized after cutting and punching, with 85 µm or more of zinc to ISO 1461.
  3. Bolted on galvanized ground screws with no concrete and no site welding; designed per project up to 200 mph (89 m/s).

Compatible sites and modules

  • Farmland with crops under the array
  • Tractor and hand-work access under the array
  • Framed modules in landscape

Components

  • SR-G10 module rails with bolted joints carrying the modulesModule railZAM coated steel rail; carries the modules in landscape rows across the top beams
  • SR-G10 bolted joint of column, top beam and knee braceTop beamSpans the columns and carries the module rails
  • SR-G10 galvanized steel column with knee brace under the top beamColumnHot-dip galvanized S355 steel leg that lifts the array 3 m or more above the crop
  • SR-G10 galvanized steel column with knee brace under the top beamKnee braceDiagonal stiffener between the column and the top beam
  • SR-G10 portal frames with knee braces, cross-braced bays and tie beamsCross-braceDiagonal bracing that keeps each bay stable
  • SR-G10 portal frames with knee braces, cross-braced bays and tie beamsTie beamLongitudinal bracing that ties the frames together
  • U-baseConnects each column to its ground screw
  • Helical ground screw pile with welded flight plates for solar array foundation anchoringGround screw SR-GSHot-dip galvanized ground screw, driven with no concrete; length and embedment from the soil data

Technical parameters

Ground HDG Steel Agrivoltaic Mount SR-G10: indicative parameters. Final values follow project engineering.
ParameterValueBasis
StructurePortal frames of columns, top beams and knee braces; cross-braces and tie beams across the baysSolaracks spec
SteelS355 carbon steel: yield 355 MPa, tensile 470 MPaSolaracks spec
Frame coatingHot-dip galvanized after cutting and punching; every frame member batch-dipped, hollow sections includedISO 1461
Zinc coating thickness85 µm or moreISO 1461
Module railsZAM (Zn-Al-Mg) coated steel, laid across the top beamsSolaracks spec
Rail coatingZM275 (275 g/m²) as standard; ZM310 or ZM350 for high-corrosion sitesSolaracks spec
Crop clearance3 m or more under the arraySolaracks spec
Clearance height and row spacingSet for the crop and the machinery that works under the arrayProject-specific
Light shareRow gaps tuned to the crop, passing roughly two-thirds of daylight to the groundProject-specific
Module layoutLandscape, in spaced rowsSolaracks spec
Tilt angleFixed, set to the site latitude or the cropProject-specific
FoundationHot-dip galvanized SR-GS ground screws, no concrete; a U-base joins each column to its screwSolaracks spec
SoilPile type, length and embedment come from the soil report or an on-site pull-out testProject-specific
JointsBolted throughout, no site weldingSolaracks spec
Design wind speedUp to 200 mph (89 m/s), ASCE 7-22 basic wind speedProject-specific
Snow loadPer siteProject-specific
BoltsCarbon steel bolts, grade 8.8: hot-dip galvanized below C4, TDC thermo-diffusion zinc coated at C4 and above; no stainless steel touches the coatingSolaracks spec
TorqueGrade 8.8 bolts on the steel frame: M10 44 to 46 N·m; M12 80 to 82 N·m; larger bolts to the values on the project drawings; M8 module clamp bolts 15 to 17 N·mSolaracks spec
Damaged zincWire-brush and coat with zinc-rich paint of 70% zinc or moreSolaracks spec
Warranty12 years on the structure; hot-dip galvanized coating 5 years; ZAM coating 10 years on the module rails (Solaracks Limited Warranty SR-WT-001)Solaracks spec

Material and coating options

ParameterValue
MaterialS355 carbon steel frame, hot-dip galvanized to ISO 1461; module rails in ZAM (Zn-Al-Mg) coated steel; carbon steel bolts, grade 8.8, hot-dip galvanized below C4 and TDC coated at C4 and above
Finish / coatingFrame hot-dip galvanized after cutting and punching, 85 µm or more of zinc (ISO 1461); module rails ZAM coated, ZM275 standard, ZM310 or ZM350 for high-corrosion sites

Engineering basis

Solaracks, a solar mounting manufacturer in Xiamen, China, since 2012, calculates every SR-G10 array for its site. Wind and snow loads come from the project's code, such as ASCE 7-22, JIS C 8955, or the AS/NZS 1170 and EN 1991-1 series. Static checks follow that code, and the frame is modelled in SAP2000 where the layout needs it. Foundations are sized from the soil report or from on-site pull-out tests. ISO 9223 classifies the site, not the product; the coating and bolt grades in the parameter table are the Solaracks specification for each class. A high frame takes larger overturning moments at its feet, so the knee braces, cross-braces, column spacing and ground screw length come from the calculation for the clearance chosen. Row gaps start from the light share the crop needs. Send complete site data and the structural design and quote come back within 24 hours.

  • ASCE 7-22
  • AS/NZS 1170.2
  • JIS C 8955
  • EN 1991-1-4
  • ISO 9223 (site corrosivity)

How Solaracks runs wind load calculations →

Installation and packing notes

  1. Drive the hot-dip galvanized SR-GS ground screws at the positions on the design drawing, with no concrete. Length and embedment come from the soil report or an on-site pull-out test.
  2. Stand the columns: each column bolts to a U-base on its ground screw.SR-G10 columns standing on ground screws before the beams go up
  3. Set the top beams and knee braces on the columns.SR-G10 top beam and knee braces set on a row of columnsSR-G10 bolted joint of column, top beam and knee brace
  4. Brace the bays: cross-braces and tie beams lock the frames into one grid.SR-G10 portal frames with knee braces, cross-braced bays and tie beams
  5. Fit the module rails and place the modules in landscape, in spaced rows, to complete the array. Every joint is bolted, with no site welding; bolt sizes and positions are on the project drawings.SR-G10 module rails with bolted joints carrying the modulesSR-G10 hot-dip galvanized steel agrivoltaic frame with landscape module rows high above the ground

Inspect the array once a year and after winds above 80% of the design wind speed: check piles and frames for movement, re-check bolt torque and make sure no clamp has lifted from its module. Wire-brush any rust on galvanized or ZAM parts and coat it with zinc-rich paint of 70% zinc or more. In polluted or coastal air, rinse aluminium parts with clean water during panel cleaning.

Steel members and fasteners ship on pallets, boxed by type, each with a packing list and part labels. Standard items usually ship in 15 to 20 days; each quote confirms the date.

Packing and installation control →

Downloads

Related systems and guides

Calculation basis: AS/NZS 1170.2 / ASCE 7-22Structural design & quote: 24 hWarranty: 12 years structure, 5 years galvanising, 10 years ZAM coating

Frequently asked questions

How high is SR-G10 above the crop?

3 m or more of crop clearance. The final height and row spacing are set per project for the crop and the machinery that works under the array; send the machine height and width.

How much light reaches the crop?

The row gaps are tuned to the crop, passing roughly two-thirds of daylight to the ground. Send the crop so the gaps can be set for it.

What foundations does SR-G10 use?

Hot-dip galvanized SR-GS ground screws, with no concrete, so the screws can be removed later. Length and embedment come from the soil report or an on-site pull-out test.

How is the steel protected?

Every member is hot-dip galvanized after it is cut and punched, so the zinc reaches every surface, inside and out, with 85 µm or more to ISO 1461. The zinc corrodes first and so protects small scratches, drilled holes and cut edges.

Which bolts hold the frame?

Carbon steel bolts, grade 8.8: hot-dip galvanized below C4 and TDC thermo-diffusion zinc coated at C4 and above, so no stainless steel touches the zinc.

Is anything welded on site?

No. Every joint is bolted: the columns on U-bases, the top beams and knee braces, the cross-braces and tie beams, then the rails and modules.

What warranty applies?

12 years on the structure, 5 years on the hot-dip galvanized coating and 10 years on the ZAM coating of the module rails, under Solaracks Limited Warranty SR-WT-001.

How fast can I get an SR-G10 design and quote?

Within 24 hours of receiving complete site data: the layout or array size, the location or design wind speed and snow load, the soil data and the module model. Standard items usually ship in 15 to 20 days; each quote confirms the date.

What should I send for an SR-G10 quote?

The crop, the machinery and the clearance it needs, the soil data, the site layout, the site location or design wind and snow loads, the module model, the tilt and layout wanted, and the distance to the sea or the ISO 9223 class, which sets the coating and bolt grade.

Get an engineered mounting quote for your project.

Share drawings, module layout, site location, wind load, snow load and corrosion environment. Solaracks will recommend the system, material, layout and packing approach.

Request a quote
×

Request this document

Enter your company and contact details. We review each request and email you a download link once it is approved.

Requested document Requested document

Close