Components
Module railZAM coated steel rail; carries the modules in landscape rows across the top beams
Top beamSpans the columns and carries the module rails
ColumnHot-dip galvanized S355 steel leg that lifts the array 3 m or more above the crop
Knee braceDiagonal stiffener between the column and the top beam
Cross-braceDiagonal bracing that keeps each bay stable
Tie beamLongitudinal bracing that ties the frames together- U-baseConnects each column to its ground screw
Ground screw SR-GSHot-dip galvanized ground screw, driven with no concrete; length and embedment from the soil data
Technical parameters
Ground HDG Steel Agrivoltaic Mount SR-G10: indicative parameters. Final values follow project engineering.| Parameter | Value | Basis |
|---|
| Structure | Portal frames of columns, top beams and knee braces; cross-braces and tie beams across the bays | Solaracks spec |
|---|
| Steel | S355 carbon steel: yield 355 MPa, tensile 470 MPa | Solaracks spec |
|---|
| Frame coating | Hot-dip galvanized after cutting and punching; every frame member batch-dipped, hollow sections included | ISO 1461 |
|---|
| Zinc coating thickness | 85 µm or more | ISO 1461 |
|---|
| Module rails | ZAM (Zn-Al-Mg) coated steel, laid across the top beams | Solaracks spec |
|---|
| Rail coating | ZM275 (275 g/m²) as standard; ZM310 or ZM350 for high-corrosion sites | Solaracks spec |
|---|
| Crop clearance | 3 m or more under the array | Solaracks spec |
|---|
| Clearance height and row spacing | Set for the crop and the machinery that works under the array | Project-specific |
|---|
| Light share | Row gaps tuned to the crop, passing roughly two-thirds of daylight to the ground | Project-specific |
|---|
| Module layout | Landscape, in spaced rows | Solaracks spec |
|---|
| Tilt angle | Fixed, set to the site latitude or the crop | Project-specific |
|---|
| Foundation | Hot-dip galvanized SR-GS ground screws, no concrete; a U-base joins each column to its screw | Solaracks spec |
|---|
| Soil | Pile type, length and embedment come from the soil report or an on-site pull-out test | Project-specific |
|---|
| Joints | Bolted throughout, no site welding | Solaracks spec |
|---|
| Design wind speed | Up to 200 mph (89 m/s), ASCE 7-22 basic wind speed | Project-specific |
|---|
| Snow load | Per site | Project-specific |
|---|
| Bolts | Carbon steel bolts, grade 8.8: hot-dip galvanized below C4, TDC thermo-diffusion zinc coated at C4 and above; no stainless steel touches the coating | Solaracks spec |
|---|
| Torque | Grade 8.8 bolts on the steel frame: M10 44 to 46 N·m; M12 80 to 82 N·m; larger bolts to the values on the project drawings; M8 module clamp bolts 15 to 17 N·m | Solaracks spec |
|---|
| Damaged zinc | Wire-brush and coat with zinc-rich paint of 70% zinc or more | Solaracks spec |
|---|
| Warranty | 12 years on the structure; hot-dip galvanized coating 5 years; ZAM coating 10 years on the module rails (Solaracks Limited Warranty SR-WT-001) | Solaracks spec |
|---|
Material and coating options
| Parameter | Value |
|---|
| Material | S355 carbon steel frame, hot-dip galvanized to ISO 1461; module rails in ZAM (Zn-Al-Mg) coated steel; carbon steel bolts, grade 8.8, hot-dip galvanized below C4 and TDC coated at C4 and above |
|---|
| Finish / coating | Frame hot-dip galvanized after cutting and punching, 85 µm or more of zinc (ISO 1461); module rails ZAM coated, ZM275 standard, ZM310 or ZM350 for high-corrosion sites |
|---|
Engineering basis
Solaracks, a solar mounting manufacturer in Xiamen, China, since 2012, calculates every SR-G10 array for its site. Wind and snow loads come from the project's code, such as ASCE 7-22, JIS C 8955, or the AS/NZS 1170 and EN 1991-1 series. Static checks follow that code, and the frame is modelled in SAP2000 where the layout needs it. Foundations are sized from the soil report or from on-site pull-out tests. ISO 9223 classifies the site, not the product; the coating and bolt grades in the parameter table are the Solaracks specification for each class. A high frame takes larger overturning moments at its feet, so the knee braces, cross-braces, column spacing and ground screw length come from the calculation for the clearance chosen. Row gaps start from the light share the crop needs. Send complete site data and the structural design and quote come back within 24 hours.
- ASCE 7-22
- AS/NZS 1170.2
- JIS C 8955
- EN 1991-1-4
- ISO 9223 (site corrosivity)
How Solaracks runs wind load calculations →
Related systems and guides
Frequently asked questions
How high is SR-G10 above the crop?
3 m or more of crop clearance. The final height and row spacing are set per project for the crop and the machinery that works under the array; send the machine height and width.
How much light reaches the crop?
The row gaps are tuned to the crop, passing roughly two-thirds of daylight to the ground. Send the crop so the gaps can be set for it.
What foundations does SR-G10 use?
Hot-dip galvanized SR-GS ground screws, with no concrete, so the screws can be removed later. Length and embedment come from the soil report or an on-site pull-out test.
How is the steel protected?
Every member is hot-dip galvanized after it is cut and punched, so the zinc reaches every surface, inside and out, with 85 µm or more to ISO 1461. The zinc corrodes first and so protects small scratches, drilled holes and cut edges.
Which bolts hold the frame?
Carbon steel bolts, grade 8.8: hot-dip galvanized below C4 and TDC thermo-diffusion zinc coated at C4 and above, so no stainless steel touches the zinc.
Is anything welded on site?
No. Every joint is bolted: the columns on U-bases, the top beams and knee braces, the cross-braces and tie beams, then the rails and modules.
What warranty applies?
12 years on the structure, 5 years on the hot-dip galvanized coating and 10 years on the ZAM coating of the module rails, under Solaracks Limited Warranty SR-WT-001.
How fast can I get an SR-G10 design and quote?
Within 24 hours of receiving complete site data: the layout or array size, the location or design wind speed and snow load, the soil data and the module model. Standard items usually ship in 15 to 20 days; each quote confirms the date.
What should I send for an SR-G10 quote?
The crop, the machinery and the clearance it needs, the soil data, the site layout, the site location or design wind and snow loads, the module model, the tilt and layout wanted, and the distance to the sea or the ISO 9223 class, which sets the coating and bolt grade.