The economical choice for large commercial and utility installations, especially on uneven terrain. Rammed posts eliminate excavation; a pile driver cuts labour and time on site, and the saving scales with project size. Single-post and double-post designs are available.

Ground Pile-Driven Mount SR-G8 — figure 1
Ground Pile-Driven Mount SR-G8 — figure 2
Ground Pile-Driven Mount SR-G8 — figure 3

Technical parameters

FoundationRammed steel posts, no excavation
Material6005-T5 aluminium, SS304, HDG Q235B posts
Wind speedUp to 88 m/sAS/NZS 1170.2 / ASCE 7-22
Corrosivity categoryC3, higher classes can be customizedISO 9223

Related products

    One structure per site. — Engineered design & quote within 24 hours.

    Calculation basis: AS/NZS 1170.2 / ASCE 7-22Stamped design & quote: 24 hWarranty: 12 yearsDesign life: 25+ years

    Get an engineered mounting quote for your project.

    Share drawings, module layout, site location, wind load, snow load and corrosion environment. Solaracks will recommend the system, material, layout and packing approach.

    Request a quote