Pre-stressed high-strength concrete piles carry the racking where soft soils, high water tables or aggressive ground rule steel piles out — fish ponds, reclaimed land and coastal flats. The concrete pile takes the ground; the aluminium structure above stays standard.

Ground PHC Pile Mount SR-G9 — figure 1
Ground PHC Pile Mount SR-G9 — figure 2
Ground PHC Pile Mount SR-G9 — figure 3

Technical parameters

FoundationPHC concrete piles
Use caseSoft soils, high water table, aquavoltaics
Structure6005-T5 aluminium, SS304

Related products

    One structure per site. — Engineered design & quote within 24 hours.

    Calculation basis: AS/NZS 1170.2 / ASCE 7-22Stamped design & quote: 24 hWarranty: 12 yearsDesign life: 25+ years

    Get an engineered mounting quote for your project.

    Share drawings, module layout, site location, wind load, snow load and corrosion environment. Solaracks will recommend the system, material, layout and packing approach.

    Request a quote