The GTS aluminium platform on ground-screw foundations — no concrete, no cure time. Screws drive in and racking follows the same week; on soft or unknown soil, on-site pull-out tests size the piles before the order is fixed, so foundations are proven rather than assumed.

Ground Screw-Pile Mount SR-G1 — figure 1
Ground Screw-Pile Mount SR-G1 — figure 2
Ground Screw-Pile Mount SR-G1 — figure 3

Technical parameters

FoundationGround screws, pull-out tested on site
Material6005-T5 aluminium, SS304, HDG Q235B screws
Wind speedUp to 80 m/sAS/NZS 1170.2 / ASCE 7-22
Corrosivity categoryC3, higher classes can be customizedISO 9223

Related products

    One structure per site. — Engineered design & quote within 24 hours.

    Calculation basis: AS/NZS 1170.2 / ASCE 7-22Stamped design & quote: 24 hWarranty: 12 yearsDesign life: 25+ years

    Get an engineered mounting quote for your project.

    Share drawings, module layout, site location, wind load, snow load and corrosion environment. Solaracks will recommend the system, material, layout and packing approach.

    Request a quote