SR-C1 is an aluminium solar carport canopy. Each frame is a foot, legs and a supporting beam in anodized 6005-T5 aluminium, bolted onto J-bolts cast into concrete foundations. Rails run across the beams in rail clamps, and the modules clamp to the rails with inter and end clamps. EPDM foam and mid covers close the joints between modules, so rain runs off the module surface instead of dripping onto the cars. One span between foundations covers the width of two parked cars. Every SR-C1 is designed per project for ASCE 7-22 basic wind speeds up to 200 mph (89 m/s).

FitsCar parks at homes, offices, shops and factories, in one row or two rows back to back; EV charging bays
Fixes intoConcrete foundations with cast-in J-bolts, 1200 mm apart in each foundation and in one line within ±5 mm
LimitsNeeds concrete foundations laid out to the design. For a galvanized steel carport with gutters under the module joints, see SR-C2
SR-C1 aluminium solar carport canopy over two parked cars
One span between foundations covers two parking bays.
SR-C1 carport canopy with modules installed on aluminium framesSR-C1 side view drawing with a car under the canopySR-C1 aluminium frames lined up on their foundationsRails fixed across the SR-C1 supporting beams

Benefits

  1. One span between foundations covers two parking bays, so fewer posts stand between the cars.
  2. EPDM foam and mid covers close the module joints, so the canopy sheds rain over the bays.
  3. Anodized aluminium frames, designed per project up to 200 mph (89 m/s), with a 12-year structural warranty.

Compatible sites and modules

  • Car parks and driveways
  • EV charging bays
  • Framed modules, portrait or landscape

Components

  • SR-C1 slotted aluminium footFootAluminium foot with long slots, bolted onto the J-bolts in the foundation
  • SR-C1 aluminium legLegAluminium leg, bolted into the foot with M12 × 150 bolts
  • SR-C1 aluminium supporting beamSupporting beamAluminium beam across the top of the legs, bolted with M12 × 130 bolts
  • SR-C1 square-tube beam connector with M12 boltsBeam connector400 mm square-tube joiner for longer beams, 4 M12 × 130 bolts
  • SR-C1 anodized aluminium railRailAnodized 6005-T5 aluminium rail across the beams; layout per project drawing
  • SR-C1 internal rail splice with self-drilling screwsRail spliceInternal joiner, half in each rail, 8 ST6.3 × 25 self-drilling screws into each rail
  • SR-C1 rail clamp for the supporting beamRail clampHolds the bottom channel of the rail on the supporting beam
  • SR-C1 pre-assembled inter clampInter clampPre-assembled; holds the frames of two modules side by side
  • SR-C1 pre-assembled end clampEnd clampPre-assembled; holds the last module of each row

Technical parameters

Carport Canopy Mount SR-C1: indicative parameters. Final values follow project engineering.
ParameterValueBasis
SystemAluminium canopy: foot, legs and supporting beam per frame, rails across the beamsSolaracks spec
SpanOne span between foundations covers the width of two parked carsSolaracks spec
LayoutSingle-slope frames repeated along one row of parking, or set back to back over two rowsSolaracks spec
FoundationConcrete with cast-in J-bolts, 1200 mm apart in each foundation, all in one line within ±5 mmSolaracks spec
Foundation size and spacingFrom the structural design and the soil dataProject-specific
FootSlotted foot bolted onto the J-bolts; the slots allow adjustment on siteSolaracks spec
Frame boltsLegs into the foot with M12 × 150 bolts; beam onto the legs with M12 × 130 boltsSolaracks spec
Beam joint400 mm square-tube joiner with 4 M12 × 130 bolts, for beams longer than one lengthSolaracks spec
RailsAluminium rails in rail clamps on the beams, laid out at right angles to the beams per the project drawingSolaracks spec
Rail jointsInternal joiner with 8 ST6.3 × 25 self-drilling screws into each rail, 16 per jointSolaracks spec
Module clampingPre-assembled inter and end clamps on the railsSolaracks spec
Module jointsEPDM foam along the module edges and mid covers fixed with channel nutsSolaracks spec
Module orientationPortrait or landscape; most framed module sizesSolaracks spec
Tilt and clear heightTilt 5 to 10°; clear height 2500 mm or more; both set per projectSolaracks spec
Design wind speedUp to 200 mph (89 m/s), ASCE 7-22 basic wind speedProject-specific
Snow loadPer siteProject-specific
Material6005-T5 aluminium, anodized; tensile strength 260 MPa, yield 240 MPaSolaracks spec
Anodizing by site class12 µm for C2 to C3; 15 µm for C4; 20 µm for C5 (ISO 9223)Solaracks spec
BoltsA2-70 (304) below C4; A4 (316) at C4 and aboveSolaracks spec
TorqueM8 clamp bolts 15 to 17 N·m; M12 frame bolts 50 N·mSolaracks spec
ElectricalCabling, earthing and any EV charging to local code, by a qualified electricianProject-specific
Warranty12 years on the structure, aluminium and stainless parts; anodized finish appearance 5 years (Solaracks Limited Warranty SR-WT-001)Solaracks spec

Material and coating options

ParameterValue
Material6005-T5 aluminium, anodized; A2-70 (304) stainless bolts, A4 (316) at C4 and above
Finish / coatingAluminium anodized: 12 µm standard; 15 µm for C4 and 20 µm for C5 sites

Engineering basis

Solaracks, a solar mounting manufacturer in Xiamen, China, since 2012, calculates every SR-C1 carport for its site. Wind and snow loads come from the project's code, such as ASCE 7-22, JIS C 8955, or the AS/NZS 1170 and EN 1991-1 series. Static checks follow that code, and the frame is modelled in SAP2000 where the layout needs it. Foundations are sized from the soil report, and the foundation drawings are issued with the structural design so the civil works can start before the structure arrives. ISO 9223 classifies the site, not the product; the coating and bolt grades in the parameter table are the Solaracks specification for each class. The J-bolts in each foundation must stand in one line within ±5 mm; the slots in the foot take up the rest on site. Aluminium profiles are anodized before they are cut and drilled, so cut ends and bolt holes are bare aluminium. Send complete site data and the structural design and quote come back within 24 hours.

  • ASCE 7-22
  • AS/NZS 1170.2
  • JIS C 8955
  • EN 1991-1-4
  • ISO 9223 (site corrosivity)

How Solaracks runs wind load calculations →

Installation and packing notes

  1. Set out the carport from the design and site plan, mark each foundation and check that all angles are square.
  2. The civil contractor casts the concrete foundations with J-bolts 1200 mm apart, all in one line within ±5 mm; the distance between foundations follows the design.Concrete strip foundations with cast-in J-bolts for SR-C1
  3. Insert the legs into the foot and fix them with M12 × 150 bolts and nuts, then bolt the supporting beam onto the legs with M12 × 130 bolts.SR-C1 legs bolted into the foot with M12 × 150 bolts
  4. Stand each frame on its J-bolts, use the slots in the foot to adjust, and line up all frames before tightening the M12 frame bolts to 50 N·m.SR-C1 foot bolted onto the J-bolts of a concrete foundationSR-C1 frame standing on its foundation
  5. Where a beam is longer than one length, join it with the 400 mm square-tube joiner and 4 M12 × 130 bolts.SR-C1 beam joined with a square-tube connector
  6. Mark the rail positions on the beams and set the bottom channel of each rail in its rail clamps. Fix the lower side of each rail first, with its two clamps, so it cannot tip; then align the rails at right angles to the beams and tighten.SR-C1 rail held on the supporting beam by rail clamps
  7. Join rails where needed: push half of the splice into each rail and fix it with 8 ST6.3 × 25 self-drilling screws into each rail, 16 per joint.SR-C1 rail splice fixed with self-drilling screws
  8. Place the modules from the lower edge up, following the module maker's manual, with end clamps at the row ends and inter clamps between modules. Leave the clamps loose until the row is aligned, then tighten the M8 clamp bolts to 15 to 17 N·m.First module placed on the SR-C1 rails from the lower edge
  9. Glue EPDM foam along the module edges and fix the long mid covers with channel nuts to close the joints.SR-C1 mid cover closing the joint between two modules
  10. Cabling and earthing by a qualified electrician, to local code.

Inspect the carport once a year and after winds above 80% of the design wind speed: check the frames for movement, re-check bolt torque, make sure no clamp has lifted from its module and clear leaves from gutters and covers. Wire-brush any rust on galvanized parts and coat it with zinc-rich paint of 70% zinc or more. In polluted or coastal air, rinse aluminium parts with clean water during panel cleaning.

Each carport ships as a project kit on pallets: frames, beams and rails labelled per bay, clamps and fasteners boxed by type, each with a packing list and part labels. Store the parts dry and unbundled until they go up, so galvanized parts do not get white rust. Standard items usually ship in 15 to 20 days; each quote confirms the date.

Packing and installation control →

Downloads

Related systems and guides

Calculation basis: AS/NZS 1170.2 / ASCE 7-22Structural design & quote: 24 hWarranty: 12 years

Frequently asked questions

What foundation does SR-C1 need?

Concrete foundations cast by the civil contractor, with J-bolts 1200 mm apart in each foundation, all in one line within ±5 mm. Foundation size and spacing come from the structural design and the soil data, and the foundation drawings are issued with the design.

How many cars fit under one span?

One span between foundations covers the width of two parked cars. Frames stand in one row, or back to back over two rows of parking. The number of spans, the clear height (2500 mm or more) and the tilt (5 to 10°) are set per project.

Does the canopy keep the rain off the cars?

The joints between modules are closed with EPDM foam and mid covers fixed with channel nuts, so rain runs off the module surface to the low edge. Plan where that water goes at the low edge of the canopy.

What wind speed can SR-C1 be designed for?

Each carport is calculated for its site, for ASCE 7-22 basic wind speeds up to 200 mph (89 m/s). Frame, span and foundation sizes follow from the site wind and snow loads and the module layout.

How is SR-C1 different from SR-C2?

SR-C1 is an aluminium canopy with rails, clamps, EPDM foam and mid covers. SR-C2 is a hot-dip galvanized steel carport on single posts, with gutters under the module joints.

Is SR-C1 suitable for coastal sites?

The frame is anodized 6005-T5 aluminium with stainless bolts. At ISO 9223 C4 and C5 sites the anodizing goes up to 15 or 20 µm and the bolts to A4 (316).

How fast can I get an SR-C1 design and quote?

Within 24 hours of receiving complete site data: the parking plan or number of bays, the location or design wind speed and snow load, the soil data and the module model. Standard items usually ship in 15 to 20 days; each quote confirms the date.

What should I send for an SR-C1 quote?

The parking plan or number of bays, the soil data, the site location or design wind and snow loads, the module model, the tilt and layout wanted, and the distance to the sea or the ISO 9223 class, which sets the coating and bolt grade.

Get an engineered mounting quote for your project.

Share drawings, module layout, site location, wind load, snow load and corrosion environment. Solaracks will recommend the system, material, layout and packing approach.

Request a quote
×

Request this document

Enter your company and contact details. We review each request and email you a download link once it is approved.

Requested document material certification al6005 t5.pdf

Close