Components
FootAluminium foot with long slots, bolted onto the J-bolts in the foundation
LegAluminium leg, bolted into the foot with M12 × 150 bolts
Supporting beamAluminium beam across the top of the legs, bolted with M12 × 130 bolts
Beam connector400 mm square-tube joiner for longer beams, 4 M12 × 130 bolts
RailAnodized 6005-T5 aluminium rail across the beams; layout per project drawing
Rail spliceInternal joiner, half in each rail, 8 ST6.3 × 25 self-drilling screws into each rail
Rail clampHolds the bottom channel of the rail on the supporting beam
Inter clampPre-assembled; holds the frames of two modules side by side
End clampPre-assembled; holds the last module of each row
Technical parameters
Carport Canopy Mount SR-C1: indicative parameters. Final values follow project engineering.| Parameter | Value | Basis |
|---|
| System | Aluminium canopy: foot, legs and supporting beam per frame, rails across the beams | Solaracks spec |
|---|
| Span | One span between foundations covers the width of two parked cars | Solaracks spec |
|---|
| Layout | Single-slope frames repeated along one row of parking, or set back to back over two rows | Solaracks spec |
|---|
| Foundation | Concrete with cast-in J-bolts, 1200 mm apart in each foundation, all in one line within ±5 mm | Solaracks spec |
|---|
| Foundation size and spacing | From the structural design and the soil data | Project-specific |
|---|
| Foot | Slotted foot bolted onto the J-bolts; the slots allow adjustment on site | Solaracks spec |
|---|
| Frame bolts | Legs into the foot with M12 × 150 bolts; beam onto the legs with M12 × 130 bolts | Solaracks spec |
|---|
| Beam joint | 400 mm square-tube joiner with 4 M12 × 130 bolts, for beams longer than one length | Solaracks spec |
|---|
| Rails | Aluminium rails in rail clamps on the beams, laid out at right angles to the beams per the project drawing | Solaracks spec |
|---|
| Rail joints | Internal joiner with 8 ST6.3 × 25 self-drilling screws into each rail, 16 per joint | Solaracks spec |
|---|
| Module clamping | Pre-assembled inter and end clamps on the rails | Solaracks spec |
|---|
| Module joints | EPDM foam along the module edges and mid covers fixed with channel nuts | Solaracks spec |
|---|
| Module orientation | Portrait or landscape; most framed module sizes | Solaracks spec |
|---|
| Tilt and clear height | Tilt 5 to 10°; clear height 2500 mm or more; both set per project | Solaracks spec |
|---|
| Design wind speed | Up to 200 mph (89 m/s), ASCE 7-22 basic wind speed | Project-specific |
|---|
| Snow load | Per site | Project-specific |
|---|
| Material | 6005-T5 aluminium, anodized; tensile strength 260 MPa, yield 240 MPa | Solaracks spec |
|---|
| Anodizing by site class | 12 µm for C2 to C3; 15 µm for C4; 20 µm for C5 (ISO 9223) | Solaracks spec |
|---|
| Bolts | A2-70 (304) below C4; A4 (316) at C4 and above | Solaracks spec |
|---|
| Torque | M8 clamp bolts 15 to 17 N·m; M12 frame bolts 50 N·m | Solaracks spec |
|---|
| Electrical | Cabling, earthing and any EV charging to local code, by a qualified electrician | Project-specific |
|---|
| Warranty | 12 years on the structure, aluminium and stainless parts; anodized finish appearance 5 years (Solaracks Limited Warranty SR-WT-001) | Solaracks spec |
|---|
Material and coating options
| Parameter | Value |
|---|
| Material | 6005-T5 aluminium, anodized; A2-70 (304) stainless bolts, A4 (316) at C4 and above |
|---|
| Finish / coating | Aluminium anodized: 12 µm standard; 15 µm for C4 and 20 µm for C5 sites |
|---|
Engineering basis
Solaracks, a solar mounting manufacturer in Xiamen, China, since 2012, calculates every SR-C1 carport for its site. Wind and snow loads come from the project's code, such as ASCE 7-22, JIS C 8955, or the AS/NZS 1170 and EN 1991-1 series. Static checks follow that code, and the frame is modelled in SAP2000 where the layout needs it. Foundations are sized from the soil report, and the foundation drawings are issued with the structural design so the civil works can start before the structure arrives. ISO 9223 classifies the site, not the product; the coating and bolt grades in the parameter table are the Solaracks specification for each class. The J-bolts in each foundation must stand in one line within ±5 mm; the slots in the foot take up the rest on site. Aluminium profiles are anodized before they are cut and drilled, so cut ends and bolt holes are bare aluminium. Send complete site data and the structural design and quote come back within 24 hours.
- ASCE 7-22
- AS/NZS 1170.2
- JIS C 8955
- EN 1991-1-4
- ISO 9223 (site corrosivity)
How Solaracks runs wind load calculations →
Installation and packing notes
- Set out the carport from the design and site plan, mark each foundation and check that all angles are square.
- The civil contractor casts the concrete foundations with J-bolts 1200 mm apart, all in one line within ±5 mm; the distance between foundations follows the design.

- Insert the legs into the foot and fix them with M12 × 150 bolts and nuts, then bolt the supporting beam onto the legs with M12 × 130 bolts.

- Stand each frame on its J-bolts, use the slots in the foot to adjust, and line up all frames before tightening the M12 frame bolts to 50 N·m.


- Where a beam is longer than one length, join it with the 400 mm square-tube joiner and 4 M12 × 130 bolts.

- Mark the rail positions on the beams and set the bottom channel of each rail in its rail clamps. Fix the lower side of each rail first, with its two clamps, so it cannot tip; then align the rails at right angles to the beams and tighten.

- Join rails where needed: push half of the splice into each rail and fix it with 8 ST6.3 × 25 self-drilling screws into each rail, 16 per joint.

- Place the modules from the lower edge up, following the module maker's manual, with end clamps at the row ends and inter clamps between modules. Leave the clamps loose until the row is aligned, then tighten the M8 clamp bolts to 15 to 17 N·m.

- Glue EPDM foam along the module edges and fix the long mid covers with channel nuts to close the joints.

- Cabling and earthing by a qualified electrician, to local code.
Inspect the carport once a year and after winds above 80% of the design wind speed: check the frames for movement, re-check bolt torque, make sure no clamp has lifted from its module and clear leaves from gutters and covers. Wire-brush any rust on galvanized parts and coat it with zinc-rich paint of 70% zinc or more. In polluted or coastal air, rinse aluminium parts with clean water during panel cleaning.
Each carport ships as a project kit on pallets: frames, beams and rails labelled per bay, clamps and fasteners boxed by type, each with a packing list and part labels. Store the parts dry and unbundled until they go up, so galvanized parts do not get white rust. Standard items usually ship in 15 to 20 days; each quote confirms the date.
Packing and installation control →
Related systems and guides
Calculation basis: AS/NZS 1170.2 / ASCE 7-22Structural design & quote: 24 hWarranty: 12 yearsFrequently asked questions
What foundation does SR-C1 need?
Concrete foundations cast by the civil contractor, with J-bolts 1200 mm apart in each foundation, all in one line within ±5 mm. Foundation size and spacing come from the structural design and the soil data, and the foundation drawings are issued with the design.
How many cars fit under one span?
One span between foundations covers the width of two parked cars. Frames stand in one row, or back to back over two rows of parking. The number of spans, the clear height (2500 mm or more) and the tilt (5 to 10°) are set per project.
Does the canopy keep the rain off the cars?
The joints between modules are closed with EPDM foam and mid covers fixed with channel nuts, so rain runs off the module surface to the low edge. Plan where that water goes at the low edge of the canopy.
What wind speed can SR-C1 be designed for?
Each carport is calculated for its site, for ASCE 7-22 basic wind speeds up to 200 mph (89 m/s). Frame, span and foundation sizes follow from the site wind and snow loads and the module layout.
How is SR-C1 different from SR-C2?
SR-C1 is an aluminium canopy with rails, clamps, EPDM foam and mid covers. SR-C2 is a hot-dip galvanized steel carport on single posts, with gutters under the module joints.
Is SR-C1 suitable for coastal sites?
The frame is anodized 6005-T5 aluminium with stainless bolts. At ISO 9223 C4 and C5 sites the anodizing goes up to 15 or 20 µm and the bolts to A4 (316).
How fast can I get an SR-C1 design and quote?
Within 24 hours of receiving complete site data: the parking plan or number of bays, the location or design wind speed and snow load, the soil data and the module model. Standard items usually ship in 15 to 20 days; each quote confirms the date.
What should I send for an SR-C1 quote?
The parking plan or number of bays, the soil data, the site location or design wind and snow loads, the module model, the tilt and layout wanted, and the distance to the sea or the ISO 9223 class, which sets the coating and bolt grade.