The bi-metal hanger bolt is an M10 double-threaded bolt that fixes solar rail brackets through sandwich panel, metal sheet and tile roofs into the timber beams, battens or steel purlins below. Its machine stud, stainless steel SS304, stays above the roof and takes the nuts and the L-foot. Its tip is hardened 40Cr / 41Cr4 alloy steel with a zinc-nickel coating and cuts its own thread, a different thread from the stud: a wood-thread tip for timber, or a self-drilling tip for steel purlins, so no pilot hole is needed. An EPDM sealing washer seals the hole. The bolt carries the same L-feet and rails as SR-R9; for an all carbon steel self-drilling bolt, see HS1020.

FitsSandwich panel, metal sheet and tile roofs over timber beams and battens or steel purlins
InterfaceThe tip goes through the roof skin into the beam, batten or purlin with no pilot hole; the M10 stud above the roof takes an L-foot between nuts
HardwareEPDM sealing washer, nuts and washers on the stud; nut 16 to 20 N·m
MaterialSS304 stainless steel M10 stud; hardened 40Cr / 41Cr4 alloy-steel tip, zinc-nickel coated
Bi-metal hanger bolt through a corrugated sheet into the timber below, with an EPDM washer and an L-foot carrying the rail
The tip runs through the sheet into the timber below; the EPDM washer seals the hole and the L-foot on the stainless stud carries the rail.
Bi-metal hanger bolt with a wood-thread tip for timber, EPDM sealing washer, nuts and washersBi-metal hanger bolt with a self-drilling tip for steel purlins, EPDM sealing washer, nuts and washers

Technical parameters

Bi-Metal Hanger Bolt M10, Stainless Stud with Hardened Tip: indicative parameters. Final values follow project engineering.
ParameterValueBasis
TypeBi-metal hanger bolt: stainless machine stud above the roof, hardened alloy-steel tip below, each with its own threadSolaracks spec
StudM10 metric machine thread in stainless steel SS304; takes the nuts and the rail bracketSolaracks spec
Tip40Cr / 41Cr4 alloy steel, hardened; cuts its own thread, a different thread from the studSolaracks spec
Tip coatingZinc-nickel alloySolaracks spec
Tip versionsWood-thread tip for timber beams and battens; self-drilling tip for steel purlins, no pilot holeSolaracks spec
SealingEPDM sealing washer, pressed onto the roof skin by the nut above itSolaracks spec
LengthTo suit the roof build-up, with the tip thread fully in the beam, batten or purlinProject-specific
Roof typesSandwich panel, metal sheet and tile roofsSolaracks spec
SubstructureTimber beams and battens, or steel purlins; section and wall thickness checked per projectProject-specific
Bolt spacingSet from the beam or purlin spacing, module size and site wind and snow loadsProject-specific
Nut torque16 to 20 N·m on the M10 stud with a torque wrenchSolaracks spec
Use withL-feet and rails of SR-R9Solaracks spec
WarrantySS304 stud 12 years (Solaracks Limited Warranty SR-WT-001); zinc-nickel coating on the tip 10 yearsSolaracks spec

Material and coating options

ParameterValue
MaterialSS304 stainless steel M10 stud; 40Cr / 41Cr4 hardened alloy-steel tip; EPDM sealing washer
Finish / coatingTip: zinc-nickel alloy coating. Stud: stainless steel SS304

Installation and packing notes

  1. Mark the bolt positions on the roof skin over the beams, battens or purlins, on the crests of profiled sheet, 600 mm clear of the roof edges, as set out on the layout drawing.
  2. Drive the bolt square to the roof by its hex end, through the skin into the beam, batten or purlin. The tip cuts its own thread, so no pilot hole is needed.Bi-metal hanger bolt with a wood-thread tip for timber, EPDM sealing washer, nuts and washersBi-metal hanger bolt with a self-drilling tip for steel purlins, EPDM sealing washer, nuts and washers
  3. Run the EPDM sealing washer down onto the roof skin and tighten the nut above it so the washer seals the hole.Bi-metal hanger bolt sealed on a corrugated sheet with its EPDM washer, L-foot and rail above
  4. Put the L-foot on the stud between nuts, set its height and tighten the nuts to 16 to 20 N·m, then fix the rails and modules as described for SR-R9.L-foot held between nuts on the stainless stud of the bi-metal hanger bolt, with the rail fixed to it

Keep the coating on the tip intact: do not grip the threads with pliers, and replace any bolt bent during driving. Re-check the nuts once a year and after a severe storm.

Hanger bolts ship boxed with their nuts, washers and EPDM washers, with a packing list and part labels. Standard items usually ship in 15 to 20 days; each quote confirms the date.

Packing and installation control →

Downloads

Used in these systems

Structural design & quote: 24 hWarranty: 10 years zinc-nickel coating

Frequently asked questions

Which hanger bolt should I use: bi-metal, H1020 or HS1020?

All three are M10 hanger bolts for L-feet and rails. H1020, the standard bolt of SR-R9, is stainless steel 304 with a flat head and goes into a pre-drilled hole in timber or steel purlins. HS1020 is heat-treated 1022A carbon steel with a zinc-nickel coating and drills its own hole in steel purlins up to 6 mm thick. The bi-metal bolt has a stainless SS304 stud above the roof and a hardened, zinc-nickel coated tip that goes into timber beams and battens or steel purlins without a pilot hole. Send the roof build-up and Solaracks confirms the choice.

Do I need to pre-drill?

No. The wood-thread tip cuts its own thread into timber beams and battens, with no separate wood screw or insert. The self-drilling tip goes straight into steel purlins, with no pilot hole on site.

Why two metals in one bolt?

The part above the roof, which takes the nuts and the rail bracket, is stainless steel SS304. The tip has to cut its own thread in timber or steel, so it is hardened 40Cr / 41Cr4 alloy steel, with a zinc-nickel coating against corrosion.

How is the hole sealed?

An EPDM sealing washer sits on the roof skin, and the nut above it presses it down to seal the hole.

What torque does the nut need?

16 to 20 N·m on the M10 stud, with a torque wrench.

Which length do I need?

The length is set per project from the roof build-up, so that the tip thread sits fully in the beam, batten or purlin. Send the height from the roof skin to the top of the beam or purlin.

Can it go on tile roofs?

Yes. Under tile roofs it goes into the timber battens or beams. SR-R8 hooks, which fit under the tiles, are the other option; send the tile type and Solaracks confirms which fits.

What warranty comes with it?

12 years on the SS304 stainless stud and 10 years on the zinc-nickel coating of the tip.

What should I send for a quote?

The roof type and skin thickness, what is under it (timber or steel, size, spacing and wall thickness), the build-up height, the roof slope and building height, the module layout and the site location or design wind and snow loads.

Get an engineered mounting quote for your project.

Share drawings, module layout, site location, wind load, snow load and corrosion environment. Solaracks will recommend the system, material, layout and packing approach.

Request a quote
×

Request this document

Enter your company and contact details. We review each request and email you a download link once it is approved.

Requested document Requested document

Close