Base line free triangle mounting system can be used on

  • Non-penetrating roof clamps
  • Concrete foundations
  • Penetrate to substructure on metal sheet roof

Also can be used with bottom mount rail for economic purpose.

Economic Fixed tilt flat roof mount, Fixed angle flat roof mounting system, Triangle mounting system on concrete base, Triangle mounting structure on concrete base, flat roof racking, flat roof mounting system, triangle fixed tilt option, triangle fold design, Fixed tilt triangle, triangle on concrete foundation, bottom line free triangle structure
Triangle solar mounting system without base line
Economic Fixed tilt flat roof mount, Fixed angle flat roof mounting system, Triangle mounting system on concrete base, Triangle mounting structure on concrete base, flat roof racking, flat roof mounting system, triangle fixed tilt option, triangle fold design, Fixed tilt triangle, triangle on concrete foundation, bottom line free triangle structure
H rail on base line free triangle without L connector, saving cost in low wind speed region
Economic Fixed tilt flat roof mount, Fixed angle flat roof mounting system, Triangle mounting system on concrete base, Triangle mounting structure on concrete base, flat roof racking, flat roof mounting system, triangle fixed tilt option, triangle fold design, Fixed tilt triangle, triangle on concrete foundation, bottom line free triangle structure
Base line free triangle pre-assembled.  Easy for packing, shipping and installation. 
Economic Fixed tilt flat roof mount, Fixed angle flat roof mounting system, Triangle mounting system on concrete base, Triangle mounting structure on concrete base, flat roof racking, flat roof mounting system, triangle fixed tilt option, triangle fold design, Fixed tilt triangle, triangle on concrete foundation, bottom line free triangle structure
Base line free triangle mounting system on concrete foundation.

TAG:Economic Fixed tilt flat roof mount, Fixed angle flat roof mounting system, Triangle mounting system on concrete base, Triangle mounting structure on concrete base, flat roof racking, flat roof mounting system, triangle fixed tilt option, triangle fold design, Fixed tilt triangle, triangle on concrete foundation, bottom line free triangle structure

Benefits

  1. Baseline-free set-out — rows go down without a base rail line, on 3 footing routes: non-penetrating clamps, concrete or substructure fixing.
  2. 2 build routes — direct triangle or bottom-mount rail — let the calc pick the cheaper bill of materials.
  3. 12-year warranty on a 25+ year design life; sized per AS/NZS 1170.2 / ASCE 7-22 site calc.

Technical parameters

Flat-Roof Baseline-Free Triangle SR-B8 — indicative parameters. Final values follow project engineering.
ParameterValue
MaterialAnodized aluminium 6005-T5, stainless steel 304
Tensile strength (6005-T5)260 MPa ultimate, 240 MPa yield
Tensile strength (SS304)625.55 MPa ultimate, 263.8 MPa yield
AnodisingCoating class AA10, higher on request
Tilt angleFixed to project design
Wind speedUp to 88 m/s
FootingNon-penetrating clamps, concrete or substructure fixing
StandardsAS/NZS 1170.2:2011, JIS C 8955:2017, ASCE 7-22
CorrosivityC3 per ISO 9223, higher on request
Calculation basis: AS/NZS 1170.2 / ASCE 7-22Stamped design & quote: 24 hWarranty: 12 yearsDesign life: 25+ years

Frequently asked questions

Is my roof strong enough for ballast?

A per-bay load-spread calculation confirms it before anything ships - no structural surprises.

How do you size the structure for wind?

Site wind speed drives member sizing to AS/NZS 1170.2 / ASCE 7-22, and every design ships stamped - no under-engineered arrays.

Will it outlast the panels?

25+ year design life with a 12-year warranty in writing - no mid-life re-racking cost.

How fast is the quote?

Send the site data and a stamped design and quote come back within 24 hours.

Get an engineered mounting quote for your project.

Share drawings, module layout, site location, wind load, snow load and corrosion environment. Solaracks will recommend the system, material, layout and packing approach.

Request a quote