Components
FlashingAluminium flashing plate with a raised boss at the screw hole; slides up under the shingle course above each mount
L-foot with rubber padAluminium L-foot on a rubber pad that isolates it from the flashing and seals the fixing; the rail fixes to its serrated face with a T-bolt
Rafter screwSUS 410 screw through the foot and flashing into the rafter, set in sealant
T-modulePre-assembled T-bolt that tilts into the rail channel and turns to lock; its thread must not stand below the T-module
Rail SR-R1SYAnodized 6005-T5 aluminium; fixes to the L-foot with a T-bolt in the rail channel; span set per project
Rail SR-R1SAnodized 6005-T5 aluminium; same T-bolt fixing, span set per project
Rail joiner SR-S1SYJoins SR-R1SY rails; internal joiner with two bolts, one into each rail, which bond the joint
Rail joiner SR-S1SJoins SR-R1S rails; slides into the groove on the back of the rail, with two M8 × 12 stainless bolts, one into each rail
Inter clamp SR-MCUU-shape, pre-assembled with its bolt; tilts into the channel and holds two frames with a 20 mm gap. T-shape SR-MCT (17 mm gap) is the alternative
End clamp SR-ECPre-assembled, tilts into the channel; holds the last module, 30 to 35 mm frames
Adjustable end clamp SR-AECOption for 32 to 50 mm frames
Earthing clip SR-EW1Stainless steel 304 clip under each inter clamp; its teeth bite through the anodizing of both frames and bond them to the rail
Grounding lug SR-GL1Un-anodized aluminium body with a toothed SS304 clip; one per continuous rail run lands the earth conductor
Technical parameters
Asphalt-Shingle Flashing Mount: indicative parameters. Final values follow project engineering.| Parameter | Value | Basis |
|---|
| Roof types | Asphalt (composition) shingle | Solaracks spec |
|---|
| Mounting structure | Timber rafters; every foot fixes into a rafter | Solaracks spec |
|---|
| Flashing position | Top edge at least 3/4 in (19 mm) above the butt edge of the third shingle course; lower edge above the butt edge of the first | Solaracks spec |
|---|
| Fixing | One SUS 410 screw per foot into a 2 in (51 mm) pilot hole in the rafter, filled with sealant compatible with the roofing | Solaracks spec |
|---|
| Foot spacing | Set from the rafter spacing, module size and site wind and snow loads | Project-specific |
|---|
| Roof slope | Up to 60° | Solaracks spec |
|---|
| Building height | Up to 20 m in the standard range; taller buildings and cyclonic regions are checked per project | Solaracks spec |
|---|
| Rail profile | SR-R1SY or SR-R1S, anodized 6005-T5; span set per project | Solaracks spec |
|---|
| Rail end overhang | Up to 30% of the adjacent foot spacing | Solaracks spec |
|---|
| Roof zones | Keep 600 mm clear of the roof edges; fixings are closer together in the end zones (B/3) | Solaracks spec |
|---|
| Module orientation | Portrait or landscape, flush with the roof | Solaracks spec |
|---|
| Module frame height | 30 to 35 mm with SR-EC; 32 to 50 mm with SR-AEC | Solaracks spec |
|---|
| Clamping zone | Within L/4 of each frame end, never on the glass; check the module maker's manual | Solaracks spec |
|---|
| Design wind speed | Up to 200 mph (89 m/s), ASCE 7-22 basic wind speed | Project-specific |
|---|
| Snow load | Per site | Project-specific |
|---|
| Material | 6005-T5 aluminium, anodized; tensile strength 260 MPa, yield 240 MPa | Solaracks spec |
|---|
| Anodizing by site class | 12 µm for C2 to C3; 15 µm for C4; 20 µm for C5 (ISO 9223) | Solaracks spec |
|---|
| Bolts | A2-70 (304) below C4; A4 (316) at C4 and above | Solaracks spec |
|---|
| Rafter screw | SUS 410; any substitute must meet AS 3566 corrosion class 4 | Solaracks spec |
|---|
| Torque | Rafter screws 12 to 13 N·m; every M8 rail and clamp bolt 15 to 17 N·m with a torque wrench | Solaracks spec |
|---|
| Grounding | SR-EW1 clips under the inter clamps, bolted rail joiners and one SR-GL1 lug per rail run; continuity checked before the array is energised | Solaracks spec |
|---|
| Warranty | 12 years on aluminium and stainless parts; anodized finish appearance 5 years (SR-WT-001) | Solaracks spec |
|---|
Material and coating options
| Parameter | Value |
|---|
| Material | Aluminium flashing; 6005-T5 aluminium feet, rails and clamps, anodized; SUS 410 screws; stainless steel bolts |
|---|
| Finish / coating | Anodized: 12 µm standard; 15 µm for C4 and 20 µm for C5 sites |
|---|
Engineering basis
Solaracks, a solar mounting manufacturer in Xiamen, China, since 2012, calculates every flashing mount array for its site. Wind and snow loads come from the project's code, such as ASCE 7-22, JIS C 8955, or the AS/NZS 1170 and EN 1991-1 series. Static checks follow that code, and the frame is modelled in SAP2000 where the layout needs it. The whole array is designed for the worst roof zone rather than zone by zone. ISO 9223 classifies the site, not the product; the anodizing and bolt grades in the parameter table are the Solaracks specification for each class. The foot spacing follows the rafter spacing and the roof zone; every foot lands on a rafter. Profiles are anodized before they are cut and drilled, so cut ends and bolt holes are bare aluminium. Send complete site data and the structural design and quote come back within 24 hours.
- ASCE 7-22
- AS/NZS 1170.2
- JIS C 8955
- EN 1991-1-4
- ISO 9223 (site corrosivity)
How Solaracks runs wind load calculations →
Installation and packing notes
- Chalk the rafter lines and mark each mount on a rafter, 600 mm clear of the roof edges. Lift the shingle above each mark with a roofing bar, pull any nails in the way and fill the nail holes with sealant.
- Slide the flashing up under the shingle course until its top edge sits at least 3/4 in (19 mm) above the butt edge of the third course and its lower edge sits above the butt edge of the first. Mark the hole centre.
- Drill a 2 in (51 mm) deep pilot hole square to the roof into the rafter; do not use the mount as a drill guide. Blow out the dust and fill the hole with sealant compatible with the roofing.
- Set the L-foot on its rubber pad over the flashing boss, line it up with the row and drive the screw into the rafter at 12 to 13 N·m.

- Tilt the T-module into the rail channel, fix the rail to each foot and level the run, 15 to 17 N·m. Join rails with the matching joiner, keeping the rail end overhang within 30% of the foot spacing.

- Fit the end clamp at the row end. At each joint, drop an SR-EW1 clip and slide the inter clamp in loose, 2 to 3 turns; push the next module up to it and tighten to 15 to 17 N·m, within L/4 of each frame end.


- Earth the array: fit one SR-GL1 lug per continuous rail run, land the earth conductor and check continuity before the array is energised. Electrical work by a qualified electrician, to local code.

Run bolts in with a 6 mm hex bit, set the final torque with a torque wrench and mark each bolt. Re-check bolts, clamps and the earth connection once a year and after a severe storm. In polluted or coastal air, rinse the aluminium with clean water during panel cleaning.
Flashings and feet ship boxed with their screws and pads, rails on pallets and clamps pre-assembled, each with a packing list and part labels. Standard items usually ship in 15 to 20 days; each quote confirms the date.
Packing and installation control →
Related systems and guides
Frequently asked questions
Which roof types is this flashing mount for?
Asphalt (composition) shingle roofs over timber rafters. Tile roofs take SR-R8 hooks, and metal sheet roofs take SR-R5 or SR-R9.
Does the flashing mount still penetrate the roof deck?
Yes: one screw per foot goes through the flashing and deck into the rafter. The hole is sealed three ways: sealant in the pilot hole, the rubber pad under the foot and the flashing under the shingle course above.
Where does the flashing go?
Under the shingle course above the mount, with its top edge at least 3/4 in (19 mm) above the butt edge of the third course and its lower edge above the butt edge of the first, so water runs over it.
Why is the sealing point raised?
The boss on the flashing lifts the screw hole above the flashing surface, so water running down the roof flows around the fixing instead of over it.
What wind speed can it be designed for?
Up to 200 mph (89 m/s), the ASCE 7-22 basic wind speed, a 3-second gust at 10 m in Exposure C, with every foot screwed into a rafter. The foot spacing is set per project for the worst roof zone.
What torque do the fasteners need?
Rafter screws 12 to 13 N·m; every M8 rail and clamp bolt 15 to 17 N·m with a torque wrench.
How fast can I get an asphalt shingle design and quote?
Within 24 hours of receiving complete site data: the roof type and a layout, the location or design wind speed and snow load, and the module model. Standard items usually ship in 15 to 20 days; each quote confirms the date.
What should I send for an asphalt shingle quote?
The shingle type and number of layers, and the rafter size and spacing, the roof slope and building height, the module model and layout, and the site location or design wind and snow loads. The distance to the sea, or the ISO 9223 class, sets the anodizing and bolt grade.