Components
Post50 × 80 mm slotted 6005-T5 aluminium tube, 2000 mm long; its T-slots take the channel nuts of every joint
Top rail6005-T5 aluminium rail, 2592 mm long; lands on a serrated plate and is clamped into the post slot from above
Lower rail and spliceSecond rail of each bay; rails continue bay to bay through an internal splice, so the load passes through the joint
Serrated plate and channel nutThe connection at every joint: the channel nut sits in the T-slot and the serrated plate holds the rail before it is torqued
Post footBolted detail on both faces of the post; the same foot fits every foundation
Precast ballast blockConcrete block under each post; its mass is sized from the site wind figure- End and mid clampsSlot-mounted, sized to the module frame on order
- Earthing washer and grounding lugEarthing washers at the clamps bond the modules; a grounding lug per IEC 62548 lands the earth conductor
Technical parameters
Ground Aluminium Vertical Bifacial Mount SR-G3-AL: indicative parameters. Final values follow project engineering.| Parameter | Value | Basis |
|---|
| Orientation | Bifacial modules upright, one module high, faces east and west | Solaracks spec |
|---|
| Structure | Every structural member extruded in aluminium: posts, rails, splices, clamps and feet | Solaracks spec |
|---|
| Material | 6005-T5 aluminium (EN AW-6005 T5); tensile strength 260 MPa, yield 240 MPa | Solaracks spec |
|---|
| Finish | Mill finish as standard; anodized on request | Solaracks spec |
|---|
| Top height | Up to 2.0 m, one module high | Solaracks spec |
|---|
| Posts | 50 × 80 mm slotted aluminium tube, 2000 mm long | Solaracks spec |
|---|
| Rails | Two rails per bay, 2592 mm long; joined bay to bay with internal splices | Solaracks spec |
|---|
| Bay pitch | Up to 2384 mm, one module per bay | Solaracks spec |
|---|
| Bay spacing on site | Stated on the engineered drawing issued with the quotation | Project-specific |
|---|
| Joints | Serrated plate and channel nut in the T-slot of the extrusion; bolted, no site welding or drilling | Solaracks spec |
|---|
| Module clamping | Slot-mounted end and mid clamps, sized to the module frame on order | Solaracks spec |
|---|
| Reference unit | 1 × 20 run: 20 modules of 2382 × 1134 × 30 mm at 625 W, 12.5 kWp; 21 posts and 40 rails; structure 176.5 kg, about 14 kg per kWp | Solaracks spec |
|---|
| Foundation | Precast concrete ballast blocks, cast-in-place concrete pads with an anchor assembly, ground screws, or chemical anchors into an existing slab | Solaracks spec |
|---|
| Ballast mass, anchor pattern and embedment | Stated on the engineered drawing for the site; ground screws sized against an on-site pull-out test; slab anchors subject to a check of the slab | Project-specific |
|---|
| Design wind speed | Up to 35 m/s (78 mph), with each run checked against its site wind data; windier sites, taller fences and cyclone or heavy-snow sites use the steel SR-G3 | Solaracks spec |
|---|
| Snow load | Per site | Project-specific |
|---|
| Bolts | Stainless steel hex socket bolts: A2-70 (304) below C4; A4 (316) at C4 and above | Solaracks spec |
|---|
| Torque | Set for each joint in the installation manual and on the assembly drawing issued with the order; never above the stated value on an aluminium slot | Solaracks spec |
|---|
| Grounding | Earthing washers at the module clamps and a grounding lug per IEC 62548; continuity checked before the array is energised | Solaracks spec |
|---|
| Warranty | 12 years on the aluminium structure and stainless parts; anodized finish appearance 5 years where the frame is anodized (Solaracks Limited Warranty SR-WT-001) | Solaracks spec |
|---|
Material and coating options
| Parameter | Value |
|---|
| Material | 6005-T5 aluminium (EN AW-6005 T5) posts, rails, splices, clamps and feet; stainless steel hex socket bolts, A2-70 (304) below C4 and A4 (316) at C4 and above |
|---|
| Finish / coating | Mill finish as standard; anodized on request |
|---|
Engineering basis
Solaracks, a solar mounting manufacturer in Xiamen, China, since 2012, calculates every SR-G3-AL array for its site. Wind and snow loads come from the project's code, such as ASCE 7-22, JIS C 8955, or the AS/NZS 1170 and EN 1991-1 series. Static checks follow that code, and the frame is modelled in SAP2000 where the layout needs it. Foundations are sized from the soil report or from on-site pull-out tests. ISO 9223 classifies the site, not the product; the coating and bolt grades in the parameter table are the Solaracks specification for each class. The aluminium frame is released inside a narrow envelope: one module high, up to 2.0 m top height and a design wind speed of up to 35 m/s (78 mph). An upright fence catches the wind on its whole face, so bay spacing and the ballast mass, anchor pattern or embedment come from the calculation and are stated on the engineered drawing issued with the quotation, not selected on site. Ballast blocks are sized from the site wind figure. Send complete site data and the structural design and quote come back within 24 hours.
- ASCE 7-22
- AS/NZS 1170.2
- JIS C 8955
- EN 1991-1-4
- ISO 9223 (site corrosivity)
How Solaracks runs wind load calculations →
Installation and packing notes
- Set out the fence line and the post positions from the engineered drawing. Bay spacing, ballast mass, anchor pattern and embedment depth are stated on the drawing for the site, not selected on site.

- Prepare the foundations: place the precast ballast blocks with no excavation, or set the anchor assembly in a poured concrete pad, or drive ground screws sized against an on-site pull-out test, or fix chemical anchors into an existing slab once its capacity is checked.

- Bolt each post foot to its foundation on both faces, with the post plumb and in line.

- Fit the top rail: it lands on a serrated plate and clamps into the post slot from above with a channel nut. Slide it along to the module pitch, then tighten to the torque on the assembly drawing.


- Fit the lower rail the same way and carry both rails bay to bay through the internal splices.

- Stand the modules upright between the rails, one per bay, and hold them with the slot-mounted end and mid clamps, with earthing washers at the clamps.

- Earth the array: fit the grounding lug per IEC 62548, land the earth conductor and check continuity before the array is energised. Electrical work by a qualified electrician, to local code.
Inspect the fence line once a year and after a severe storm: check the posts and foundations for movement, re-check bolt torque and make sure no clamp has lifted from its module. Do not substitute fasteners or exceed the stated torque on an aluminium slot. In polluted or coastal air, rinse the aluminium with clean water during panel cleaning.
Posts, rails, splices, clamps and fasteners ship on pallets, boxed by type, each with a packing list and part labels; every member can be carried by hand along the fence line. Standard items usually ship in 15 to 20 days; each quote confirms the date.
Packing and installation control →
Related systems and guides
Calculation basis: AS/NZS 1170.2 / ASCE 7-22Structural design & quote: 24 hWarranty: 12 yearsFrequently asked questions
When should I choose SR-G3-AL instead of the steel SR-G3?
SR-G3-AL carries a fence line one module high, up to 2.0 m. For a taller fence, two module rows, a design wind speed above 35 m/s (78 mph), or a cyclone or heavy-snow site, specify the steel SR-G3, or ask Solaracks to confirm a site-specific aluminium design. The fence line can also change material where the exposure changes.
Which foundations can it stand on?
Precast concrete ballast blocks with no excavation, cast-in-place concrete pads with an anchor assembly, ground screws sized against an on-site pull-out test, or chemical anchors into an existing slab after a check of the slab. Ballast mass, anchor pattern and embedment are stated on the engineered drawing, not selected on site.
Is the aluminium coated?
Every structural member is extruded in 6005-T5 aluminium and supplied in mill finish as standard. The frame can be anodized on request.
How are the joints made?
Every joint is a serrated plate and a channel nut in the T-slot of the extrusion. The top rail lands on a serrated plate and clamps into the post slot from above, and can slide along the rail before it is torqued; rails continue bay to bay through internal splices. There is no welding and no site drilling.
How heavy is the structure?
In the reference unit, a 1 × 20 run of 2382 × 1134 × 30 mm modules at 625 W (12.5 kWp), the 21 posts and 40 rails weigh 176.5 kg in total, about 14 kg per kWp. Every member is carried by hand.
What torque do the bolts need?
The torque for each joint is printed in the installation manual issued with the order and marked on the assembly drawing. Do not substitute fasteners or exceed the stated torque on an aluminium slot.
What warranty applies?
12 years on the aluminium structure and stainless parts under Solaracks Limited Warranty SR-WT-001; where the frame is anodized, 5 years on the anodized appearance.
How fast can I get an SR-G3-AL design and quote?
Within 24 hours of receiving complete site data: the layout or array size, the location or design wind speed and snow load, the soil data and the module model. Standard items usually ship in 15 to 20 days; each quote confirms the date.
What should I send for an SR-G3-AL quote?
The fence line length and layout, the top height, the module model, the foundation wanted, the site location or design wind speed, and the distance to the sea or the ISO 9223 class, which sets the bolt grade.